|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/27/2023 Measured TD: 7892 ft. Vertical TD: 7703 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/27/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/9/2013 | | Proposed Top PZ Location: | Sec:3 Twp: 3N 65W | Footage: 92 FSL 1355 FEL | | Bottom Hole Location: | Sec:3 Twp: 3N 65W | Footage: 91 FSL 1359 FEL | | Proposed Depth/Form: | 7853 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 219, Top: , Bottom: 600 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7853 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 173, Top: 6775 ft., Bottom: 7853 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4823 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 83, Top: 4223 ft., Bottom: 4823 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/6/2011 | | Spud Date: | 10/31/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7892 ft. | Measured PB depth: | 7840 ft. | | True Vertical TD: | 7703 ft. | True Vertical PB depth: | 7657 ft. | | Top PZ Location: | Sec:3 Twp: 3N 65W | Footage: 92 FSL 1355 FEL | | Bottom Hole Location: | Sec:3 Twp: 3N 65W | Footage: 91 FSL 1359 FEL | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 630 ft., Weight: 24.0 , Citings Type: ACTUAL | | Cement: | Sacks: 245, Top: 0 ft., Bottom: 630 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7879 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 600, Top: 3196 ft., Bottom: 7879 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4457 ft. | | | | | NIOBRARA | 6984 ft. | | | | | CODELL | 7261 ft. | | | | | J SAND | 7722 ft. | | | |
Formation JSND Formation Classification: Status: AB - 10/27/2023 Interval Top: 7737 ft. Interval Bottom: 7779 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/25/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/11/2011 | | Treatment Summary: | Frac'd the J-Sand 7737’– 7779’, (48 holes) w/ 60,606 gal 18 # Vistar Hybrid cross linked gel containing 250,940# 20/40 Sand. 11-11-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7737 ft. | # Of Holes: | 48 | | Interval Bottom: | 7779 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: Status: CM - 3/30/2012 Interval Top: 7261 ft. Interval Bottom: 7278 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/25/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/11/2011 | | Treatment Summary: | Frac'd the Codell 7261’ – 7278’, (34 holes) w/ 88,326 gal 22 # Vistar Hybrid
cross linked gel containing 251,000 # 20/40 sand. 11-11-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7261 ft. | # Of Holes: | 34 | | Interval Bottom: | 7278 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/25/2012 Interval Top: 6992 ft. Interval Bottom: 7779 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 16.000 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/25/2012 | | Treatment Summary: | Set CBP @ 6940'. 02-20-12
Drilled out CBP @ 6940' and CFP @ 7120' and 7330' to commingle the JSND-NBRR-CDL. 02-22-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7721 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/25/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 143 | | BBLS_OIL | 20 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 143 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 7150 | | CALC_MCF_GAS | 365 | | CASING_PRESS | 936 | | GRAVITY_OIL | 60 | | MCF_GAS | 365 | | TUBING_PRESS | 475 |
| | Perforation Data: | | Interval Top: | 6992 ft. | # Of Holes: | 174 | | Interval Bottom: | 7779 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: Status: AB - 10/27/2023 Interval Top: 6992 ft. Interval Bottom: 7278 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/25/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6992 ft. | # Of Holes: | 126 | | Interval Bottom: | 7278 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: CM - 11/25/2011 Interval Top: 6992 ft. Interval Bottom: 7047 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/25/2011 | Choke Size: | 12.000 in. | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/11/2011 | | Treatment Summary: | Set CFP @ 7120'. 11-11-11. Frac'd the Niobrara 6992’ – 7047’ (92 holes), w/ 98,658 gals 18 # Vistar hybrid
cross linked gel containing 253,980# 20/40 sand. 11-11-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/25/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 21 | | BBLS_OIL | 114 | | BTU_GAS | 1217 | | CALC_BBLS_H2O | 21 | | CALC_BBLS_OIL | 114 | | CALC_GOR | 4579 | | CALC_MCF_GAS | 522 | | CASING_PRESS | 2235 | | GRAVITY_OIL | 59 | | MCF_GAS | 522 |
| | Perforation Data: | | Interval Top: | 6992 ft. | # Of Holes: | 92 | | Interval Bottom: | 7047 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/27/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|