Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33468
Well Classification: GW Status: PA - 2/2/2023
Well Name/No:ARISTOCRAT ANGUS #1-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/2/2023
FacilityID:422967LocationID:422974
County:WELD #123Location:LOT 1 4 3N65W 6
Field:WATTENBERG - #90750Elevation:4815 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:614FNL  1078 FELLat/Long: 40.259940 / -104.662710Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.259946 / -104.662718Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/6/2012
End Date: 9/6/2012
Reported: 12/12/2012
Days to report: 97
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 2/2/2023             Measured TD: 7450 ft.    Vertical TD: 7370 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 2/2/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/28/2013
Proposed Top PZ Location:Sec:4 Twp: 3N 65W Footage: 1313 FNL  1305 FEL
Bottom Hole Location:Sec:4 Twp: 3N 65W Footage: 1314 FNL  1304 FEL
Proposed Depth/Form:7364 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 219, Top: , Bottom: 600 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7364 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 102, Top: 6734 ft., Bottom: 7364 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4808 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 83, Top: 4208 ft., Bottom: 4808 ft.

Wellbore Completed
Completion Date:8/8/2012
Spud Date:8/3/2012Spud Date Is:ACTUAL
Measured TD:7450 ft.Measured PB depth:7437 ft.
True Vertical TD:7370 ft.True Vertical PB depth:7357 ft.
Top PZ Location:Sec:4 Twp: 3N 65WFootage: 1313 FNL  1305 FEL
Bottom Hole Location:Sec:4 Twp: 3N 65WFootage: 1314 FNL  1304 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 712 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 722 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7437 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 595, Top: 3004 ft., Bottom: 7450 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4504 ft.
NIOBRARA6992 ft.
CODELL7272 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/5/2013                  Interval Top: 7273 ft.    Interval Bottom: 7287 ft.

 Completed Information for Formation CODELL
1st Production Date:12/29/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/28/2012Treatment End Date:9/18/2012
Treatment Summary:Frac'd the Codell with 76,736 gal Hiway Hybrid cross linked gel containing 132,291# 20/40 sand. 09-06-12
Total fluid used in treatment (bbls):3125Max pressure during treatment (psi):5724
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):3125Total flowback volume recovered (bbls):825
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):132896Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7273 ft.# Of Holes:42
Interval Bottom:7287 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 2/2/2023                  Interval Top: 6998 ft.    Interval Bottom: 7287 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/29/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:12/31/2012Treatment End Date:N/A
Treatment Summary:Set CBP @ 6960'. 09-15-12 Drilled out CBP and CFP to commingle the NBRR-CDL. 09-18-12
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7253 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/31/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 55
BTU_GAS 1369
CALC_BBLS_H2O 30
CALC_BBLS_OIL 55
CALC_GOR 12618
CALC_MCF_GAS 694
CASING_PRESS 775
GRAVITY_OIL 61
MCF_GAS 694
TUBING_PRESS 484
Perforation Data:
Interval Top:6998 ft.# Of Holes:90
Interval Bottom:7287 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/5/2013                  Interval Top: 6998 ft.    Interval Bottom: 7068 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/29/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/28/2012Treatment End Date:9/18/2012
Treatment Summary:Set CFP @ 7120'. 09-06-12 Frac'd the Niobrara 6998' - 7004', 7062' - 7068' (48 holes), w/ 92,973 gals Hiway Hybrid cross linked gel containing 132,896# 20/40 sand. 09-06-12
Total fluid used in treatment (bbls):3125Max pressure during treatment (psi):5724
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):3125Total flowback volume recovered (bbls):825
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):132896Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6998 ft.# Of Holes:48
Interval Bottom:7068 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/02/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No