|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/2/2018 Measured TD: 8435 ft. Vertical TD: 8306 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/2/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/21/2013 | | Proposed Top PZ Location: | Sec:34 Twp: 2N 68W | Footage: 2498 FNL 1365 FEL | | Bottom Hole Location: | Sec:34 Twp: 2N 68W | Footage: 2486 FNL 1358 FEL | | Proposed Depth/Form: | 8364 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 650 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8364 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 7277 ft., Bottom: 8364 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/24/2011 | | Spud Date: | 8/19/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8435 ft. | Measured PB depth: | 8401 ft. | | True Vertical TD: | 8306 ft. | True Vertical PB depth: | 8272 ft. | | Top PZ Location: | Sec:34 Twp: 2N 68W | Footage: 2498 FNL 1365 FEL | | Bottom Hole Location: | Sec:34 Twp: 2N 68W | Footage: 2486 FNL 1358 FEL | | Log Types: | CBL 1670904 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 851 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 405, Top: 0 ft., Bottom: 851 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8420 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 635, Top: 4480 ft., Bottom: 8420 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4707 ft. | | | | | NIOBRARA | 7535 ft. | | | | | CODELL | 7837 ft. | | | | | J SAND | 8275 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 4/17/2015 Interval Top: 8284 ft. Interval Bottom: 8304 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/31/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/11/2011 | | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J-SAND 8284'-8304', (40 HOLES) W/69,510 GAL 18# PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,720# 20/40 SAND. 09/11/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8284 ft. | # Of Holes: | 40 | | Interval Bottom: | 8304 ft. | Hole Size: | 0.43 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 1/22/2012 Interval Top: 7610 ft. Interval Bottom: 8304 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 12/13/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/22/2012 | | Treatment Summary: | Set CBP @ 7525'. 01-18-12. Drilled out CBP @ 7525', CFP @ 7690', CFP @ 7900' to commingle the
JSND-NBRR-CDL. 01-19-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8248 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/22/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 34 | | BBLS_OIL | 17 | | BTU_GAS | 1246 | | CALC_BBLS_H2O | 34 | | CALC_BBLS_OIL | 17 | | CALC_GOR | 18118 | | CALC_MCF_GAS | 308 | | CASING_PRESS | 1086 | | GRAVITY_OIL | 51 | | MCF_GAS | 308 | | TUBING_PRESS | 516 |
| | Perforation Data: | | Interval Top: | 7610 ft. | # Of Holes: | 190 | | Interval Bottom: | 8304 ft. | Hole Size: | 0.43 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/2/2018 Interval Top: 7610 ft. Interval Bottom: 7858 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/13/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/11/2011 | | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 7900’. 09/11/2011. FRAC’D THE CODELL 7837’-7858’, (42 HOLES) W/91,392 GAL 22 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,180# 30/50 SAND. 09/11/11.
SET CFP @ 7690’. 09/11/2011. FRAC’D THE NIOBRARA 7610’-7637’, (108 HOLES) W/104,454 GALS 18 # PHASERFRAC HYBRID CROSS LINKED GEL CONTAINING 250,180# 30/50 SAND. 09/11/11.
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/14/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 23 | | BBLS_OIL | 97 | | BTU_GAS | 1246 | | CALC_BBLS_H2O | 23 | | CALC_BBLS_OIL | 97 | | CALC_GOR | 3423 | | CALC_MCF_GAS | 332 | | CASING_PRESS | 1185 | | GRAVITY_OIL | 51 | | MCF_GAS | 332 |
| | Perforation Data: | | Interval Top: | 7610 ft. | # Of Holes: | 150 | | Interval Bottom: | 7858 ft. | Hole Size: | 0.43 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/02/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|