|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 9/16/2024 Measured TD: 7435 ft. Vertical TD: 7301 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 9/16/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 4/19/2013 | | Proposed Top PZ Location: | Sec:9 Twp: 4N 67W | Footage: 2561 FSL 1300 FWL | | Bottom Hole Location: | Sec:9 Twp: 4N 67W | Footage: 2579 FSL 1297 FWL | | Proposed Depth/Form: | 7295 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 600 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7295 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7295 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/13/2011 | | Spud Date: | 10/9/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7435 ft. | Measured PB depth: | 7405 ft. | | True Vertical TD: | 7301 ft. | True Vertical PB depth: | 7271 ft. | | Top PZ Location: | Sec:9 Twp: 4N 67W | Footage: 2561 FSL 1300 FWL | | Bottom Hole Location: | Sec:9 Twp: 4N 67W | Footage: 2579 FSL 1297 FWL | | Log Types: | SD-DSN-AC-TR; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 638 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 638 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7423 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 949, Top: 110 ft., Bottom: 7423 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3563 ft. | 3950 ft. | | | | SUSSEX | 4071 ft. | 4342 ft. | | | | SHANNON | 4632 ft. | 4778 ft. | | | | NIOBRARA | 6938 ft. | | | | | FORT HAYS | 7249 ft. | | | | | CODELL | 7268 ft. | | | |
Formation NB-CD Formation Classification: OW Status: AB - 9/16/2024 Interval Top: 6958 ft. Interval Bottom: 7290 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/9/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/17/2011 | | Treatment Summary: | NB PERF 6958-7164 HOLES 66 SIZE 0.42 CD PERF 7270-7290 HOLES 60 SIZE 0.38
Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 250,990 gal Slickwater w/ 101,080# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 205,511 gal Slickwater w/ 75,140# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/26/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 100 | | BTU_GAS | 1228 | | CALC_BBLS_OIL | 100 | | CALC_GOR | 5000 | | CALC_MCF_GAS | 500 | | CASING_PRESS | 1775 | | GRAVITY_OIL | 47 | | MCF_GAS | 500 |
| | Perforation Data: | | Interval Top: | 6958 ft. | # Of Holes: | 126 | | Interval Bottom: | 7290 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/16/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|