Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33363
Well Classification: OW Status: PR - 7/1/2025
Well Name/No:FREDERIKSEN #1A-28H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2025
FacilityID:422715LocationID:422731
Municipality/County:MEAD / WELD #123Location:SENE 28 3N68W 6
Field:WATTENBERG - #90750Elevation:4976 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2250FNL  257 FELLat/Long: 40.197940 / -104.999280Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.197952 / -104.999288Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/19/2011
End Date: 9/19/2011
Reported: 2/1/2012
Prior to rule 205A.b.(2)(A)
Days to report: 135
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2025             Measured TD: 11663 ft.    Vertical TD: 6925 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/16/2013
Proposed Top PZ Location:Sec:28 Twp: 3N 68W Footage: 2240 FNL  492 FEL
Bottom Hole Location:Sec:28 Twp: 3N 68W Footage: 2015 FNL  460 FWL
Proposed Depth/Form:11748 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7398 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 823, Top: 500 ft., Bottom: 7398 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12507 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/15/2011
Spud Date:7/18/2011Spud Date Is:ACTUAL
Measured TD:11663 ft.Measured PB depth:11663 ft.
True Vertical TD:6925 ft.True Vertical PB depth:6925 ft.
Top PZ Location:Sec:28 Twp: 3N 68WFootage: 2161 FNL  626 FEL
Bottom Hole Location:Sec:28 Twp: 3N 68WFootage: 2026 FNL  648 FWL
Log Types:CBL/COMPENSATED DENSITY NEUTRON LOG/HOLE VOLUME DENSITY CALIPER LOG/8 ARM CALIPER IMAGER LOG/ARRAY INDUCTION LOG/GEO LOG PLOT
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 76 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 835 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 835 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7518 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 595, Top: 5390 ft., Bottom: 7518 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6388 ft., Depth: 11648 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX3969 ft.
NIOBRARA7061 ft.

Formation NBRR                     Formation Classification:                       Status:  PR - 7/1/2025                  Interval Top: 7608 ft.    Interval Bottom: 11441 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/19/2011
Treatment Summary:NBRR Completion STAGE 1. PUMP HYBRID FLUID SYS. OF 1014 BBLS SLICKWATER,4026 BBLS 24# X/L, 5040 TOTAL BBLS.PLACED 30,249# 40/70, 262,704# 30/50, 292,952# TOTAL SAND. STAGE 2. PUMP HYBRID FLUID SYS. OF 903 BBLS SLICKWATER, 4069 BBLS 24# X/L, 4762 TOTAL BBLS. PLACED 30,278# 40/70, 291,331# 30/50, 321,609# TOTAL SAND. STAGE 3.PUMP HYBRID FLUID SYS. OF 909 BBLS SLICKWATER, 3970 BBLS 24# X/L, 4879 TOTAL BBLS. PLACED 30,151# 40/70, 289,216# 30/50,319,367# TOTAL SAND. STAGE 4. PUMP HYBRID FLUID SYS.OF 905 BBLS SLICKWATER, 3964 BBLS 24# X/L, 4869 TOTAL BBLS.PLACED 30,291# 40/70, 287,963# 30/50, 318,254# TOTAL SAND. STAGE 5 .PUMP HYBRID FLUID SYS.OF 908 BBLS SLICKWATER&4095 BBLS XL,5004 TOTAL BBLS.PLACED 30,250# 40/70 SAND& 288,581# 30/50 SAND.TOTAL;318,780#. STAGE 6. PUMP HYBRID SYS.W/905 BBLS SLICKWATER &3969 BBLS XL:TOTAL 4875 BBLS.PLACED 30,268# 40/70 SD & 288,618# 30/50 SD-TOTAL 318,886# PROPPANT. STAGE 7 PUMP HYBRID SYS.W/907 BBLS SLICKWATER &3975 BBLS XL-TOTAL= 4881 BBLS.PLACED 30,258# 40/70 SD & 289,197 #30/50 SD AT ATR 50.5 BPM. STAGE 8.PUMP HYBRID FLUID SYS. OF 909 BBLS SLICKWATER, 3977 BBLS 24# X/L,4886 TOTAL BBLS. PLACED 30,257# 40/70, 289,310# 30 /50, 319,567# TOTAL SAND. • STAGE 9. PUMP HYBRID FLUID SYS. OF 916 BBLS SLICKWATER, 3966 BBLS 24# X/L, 4882 TOTAL BBLS.PLACED 30,313# 40/70, 287,602# 30/50,317,915# TOTAL SAND. STAGE 10.PUMP HYBRID FLUID SYS. OF 961 BBLS SLICKWATER, 3991 BBLS 24# X/L, 4951 TOTAL BBLS. PLACED 30,218# 40/70, 289,010# 30/50, 322,228# TOTAL SAND. STAGE 11. PUMP HYBRID FLUID SYS. OF 900 BBLS SLICKWATER, 3976 BBLS 24# X/L, 4876 TOTAL 8BLS.PLACED 30,230# 40/70, 289,738# 30/50, 319,967# TOTAL SAND. STAGE 12. PUMP HYBRID FLUID SYS.OF 927 BBLS SLICKWATER, 3975 BBLS 24# X/L,4902 TOTAL BBLS. PLACED 30,304# 40/70, 288,999# 30/50, 319,303# TOTAL SAND. STAGE 13. PUMP HYBRID FLUID SYS. OF 898 BBLS SLICKWATER, 3975 BBLS 24# X/L,4873 TOTAL BBLS. PLACED 16,935# 40/70, 302,6050 30/50, 319,540 TOTAL SAND. STAGE 14 PUMP W/ HYBRID SYS. W/909 BBLS SLICKWATER AND 3975 BBLS XL PLACING 16,958# 40/70 SAND AND 301,977# 30/50 SAND. STAGE 15.PUMP HYBRID FLUID SYS. OF 894 BBLS SLICKWATER, 3987 8BLS 24# X/L,4881 TOTAL BBLS. PLACED 16,958# 40/70, 304,485# 30/50, 321,443# TOTAL SAND. STAGE 16. PUMP HYBRID FLUID SYS. OF 894 BBLS SLICKWATER, 3987 BBLS 24# X/L, 4881 TOTAL BBLS.PLACED 16,958# 40/70, 304,485# 30/50, 321,443# TOTAL SAND. STAGE 17 .PUMP HYBRID FLUID SYS. OF 996 BBLS SLICKWATER,4136 BBLS 24# X/L, 5132 TOTAL BBLS. PLACED 17,204# 40/70, 325,782# 30/50, 342,986# TOTAL SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6831 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/28/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 80
BBLS_OIL 16
BTU_GAS 1415
CALC_BBLS_H2O 80
CALC_BBLS_OIL 16
CALC_GOR 72188
CALC_MCF_GAS 1155
CASING_PRESS 1350
GRAVITY_OIL 50
MCF_GAS 1155
TUBING_PRESS 900
Perforation Data:
Interval Top:7608 ft.# Of Holes:102
Interval Bottom:11441 ft.Hole Size:2.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1066
Total Gas Produced (MCF)16976
GOR15924
GOR DeterminationMCFE
Average BOE per Day10.862
Average MCFE per Day63.001

 Federal Financial Assurance  i 

 Tribal Well  i No