Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33312
Well Classification: OW Status: PR - 6/1/2020
Well Name/No:MCCONAHAY #1A-34H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2020
FacilityID:422571LocationID:422533
County:WELD #123Location:NENE 34 2N66W 6
Field:WATTENBERG - #90750Elevation:5072 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:766FNL  274 FELLat/Long: 40.099880 / -104.754720Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.099887 / -104.754737Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/25/2011
End Date: 8/25/2011
Reported: 2/1/2012
Prior to rule 205A.b.(2)(A)
Days to report: 160
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/1/2020             Measured TD: 11995 ft.    Vertical TD: 7327 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/5/2013
Proposed Top PZ Location:Sec:34 Twp: 2B 66W Footage: 957 FNL  906 FEL
Bottom Hole Location:Sec:34 Twp: 2N 66W Footage: 1927 FNL  585 FWL
Proposed Depth/Form:12040 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 10.6 in., Top: 0 ft., Depth: 1040 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 1040 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7679 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 856, Top: 500 ft., Bottom: 7679 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12040 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:7/15/2011
Spud Date:6/22/2011Spud Date Is:ACTUAL
Measured TD:11995 ft.Measured PB depth:11866 ft.
True Vertical TD:7327 ft.True Vertical PB depth:7308 ft.
Top PZ Location:Sec:34 Twp: 2B 66WFootage: 957 FNL  906 FEL
Bottom Hole Location:Sec:34 Twp: 2N 66WFootage: 1927 FNL  585 FWL
Log Types:GAMMA RESISTIVITY, DENSITY, CALIPER, CBL (INTERMEDIATE)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 90 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 835 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 241, Top: 0 ft., Bottom: 835 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7853 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 645, Top: 0 ft., Bottom: 7866 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 11972 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 307, Top: 7500 ft., Bottom: 11972 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4586 ft.
NIOBRARA7413 ft.

Formation NBRR                     Formation Classification:                       Status:  PR - 6/1/2020                  Interval Top: 7920 ft.    Interval Bottom: 11858 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/4/2011Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/19/2011
Treatment Summary:NBRR Completion Stage 1 - frac w/ 5142 BBLS total fluid and pumped 32,819 40/70 and 288,976 30/50 sand. ATP 5316 PSI, ATR 50 BPM, ISIP 2853 PSI, 5MIN 2798 PSI, FG 0.82 PSI/FT. Stage 2 -frac w/ 5099 BBLS total fluid and pumped 30,383 40/70 and 290,593# 30/50 sand. ATP 5911 PSI, ATR 51 BPM, ISIP 3355 PSI, 5MIN 3122 PSI, FG 0.89 PSI/FT. Stage 3 - frac w/ 5035 BBLS total fluid and pumped 30,152# 40/70 and 288,829 30/50 sand. ATP 5630 PSI, ATR 51 BPM, ISIP 3328 PSI, 5MIN 3090 PSI, FG 0.89 PSI /FT. Stage 4 - frac w/ 5035 BBLS total fluid and pumped 30,088 40/70 and 287,728 30/50 sand. ATP 5580 PSI, ATR 51 BPM, ISIP 3425 PSI, 5MIN 3170 PSI, FG 0.90 PSI /FT. Stage 5 - frac w/ 5038 BBLS total fluid and pumped 30,081 40/70 and 269,998 30/50 sand. ATP 6089 PSI, ATR 49 BPM, ISIP 3324 PSI, 5MIN 3051 PSI, FG 0.89 PSI/FT. Stage 6 - frac w/ 5642 BBLS total fluid and pumped 31,009 40/70 and 282,084 30/50 sand. ATP 6212 PSI, ATR 48 BPM, ISIP 3334 PSI, 5MIN 3085 PSI, FG 0.89 PSI/FT. Stage 7 - frac w/ 5646 BBLS total fluid and pumped 35,698 40/70 and 310,144# 30/50 sand. ATP 5589 PSI, ATR 49 BPM, ISIP 3346 PSI, 5MIN 3157 PSI, FG 0.89 PSI /FT. Stage 8 - frac w/ 4850 BBLS total fluid and pumped 30,055 40/70 and 198,268 30/50 sand. ATP 5835 PSI, ATR 49 BPM, ISIP 3315 PSI, 5MIN 3157 PSI, FG 0.89 PSI /FT. Stage 9 - frac w/ 5689 BBLS total fluid and pumped 34,468 40/70 and 292,838 30/50 sand. ATP 5615 PSI, ATR 39.5 BPM, ISIP 3158 PSI, 5MIN 3057 PSI, FG 0.865 PSI/FT. Stage 10 - frac w/ 5090 BBLS total fluid and pumped 30,391 40/70 and 289,165 30/50 sand. ATP 5252 PSI, ATR 46.7 BPM, ISIP 3307 PSI, 5MIN 3088 PSI, FG 0.885 PSI /FT. Stage 11 - free w/ 5326 BBLS total fluid and pumped 28,864# 40/70 and 292,094# 30/50 sand. ATP 5457 PSI, ATR 44.4 BPM, ISIP 3368 PSI, 5MIN 3096 PSI, FG 0.894 PSI/FT. Stage 12 - Frac w/ 5005 BBLS total fluid and pumped 29,667# 40/70 and 289,800# 30/50 sand. ATP 6473 PSI, ATR 50.2 BPM, ISIP 3377 PSI, 5MIN 3051 PSI, FG 0.895 PSI/FT. Stage 13 Frac w/ 5004 BBLS total fluid and pumped 30,084# 40/70 and 288,433# 30/50 sand. ATP 5493 PSI, ATR 43.8 BPM, ISIP 3520 PSI, 5MIN 3220 PSI, FG 0.915 PSI /FT. Stage 14- frac w /4966 BBLS total fluid and pumped 30,078# 40/70 and 283,322# 30/50 sand. ATP 5521 PSI, ATR 50.4 BPM, ISIP 3366 PSI, 5MIN 3040 PSI, FG 0.893 PSI /FT. Stage 15 - Frac w/4978 BBLS total fluid and pumped 30,066 40/70 and 286,683# 30/50 sand. ATP 5371 PSI, ATR 51.3 BPM, ISIP 3252 PSI, 5MIN 2979 PSI. FG 0.878 PSI /FT. Stage 16 - Frac w/ 5155 BBLS total fluid and pumped 44,113 40/70 and 297,212# 30/50 sand. ATP 5092 PSI, ATR 50.3 BPM, ISIP 3449 PSI, 5MIN 3047 PSI, FG 0.90 PSI/FT.
Tubing Size:2.375 in.Tubing Setting Depth:6936 ft.
Tubing Packer Depth:6940 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/4/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1186
BBLS_OIL 221
BTU_GAS 1260
CALC_BBLS_H2O 1186
CALC_BBLS_OIL 221
CALC_GOR 168
CALC_MCF_GAS 892
CASING_PRESS 1541
GRAVITY_OIL 43
MCF_GAS 892
TUBING_PRESS 1000
Perforation Data:
Interval Top:7920 ft.# Of Holes:768
Interval Bottom:11858 ft.Hole Size:2.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1843
Total Gas Produced (MCF)21377
GOR11599
GOR DeterminationBOE
Average BOE per Day15.153
Average MCFE per Day87.879

 Federal Financial Assurance  i 

 Tribal Well  i No