Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33301
Well Classification: OW Status: PR - 3/1/2024
Well Name/No:WILLIAM PELTIER #1A-20H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2024
FacilityID:422535LocationID:422526
Municipality/County:ERIE / WELD #123Location:NENE 20 1N68W 6
Field:WATTENBERG - #90750Elevation:5163 ft.
Planned Location:857FNL  471 FELLat/Long: 40.041530 / -105.019910Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.041530 / -105.019945Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/26/2011
End Date: 9/26/2011
Reported: 2/1/2012
Prior to rule 205A.b.(2)(A)
Days to report: 128
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2024             Measured TD: 12516 ft.    Vertical TD: 7679 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/5/2013
Proposed Top PZ Location:Sec:20 Twp: 1N 68W Footage: 511 FNL  640 FEL
Bottom Hole Location:Sec:20 Twp: 1N 68W Footage: 1338 FNL  572 FWL
Proposed Depth/Form:12507 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-125 , Unit Acreage: 320, Drill Unit: N/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 860 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 198, Top: 0 ft., Bottom: 860 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8067 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 900, Top: 500 ft., Bottom: 8067 ft.
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12507 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:9/17/2011
Spud Date:8/18/2011Spud Date Is:ACTUAL
Measured TD:12516 ft.Measured PB depth:12415 ft.
True Vertical TD:7679 ft.True Vertical PB depth:6682 ft.
Top PZ Location:Sec:20 Twp: 1N 68WFootage: 511 FNL  640 FEL
Bottom Hole Location:Sec:20 Twp: 1N 68WFootage: 1338 N  572 W
Log Types:ISOLATION SCANNER/CEMENT BOND LOG/LBC, GEOLOGPLOT
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 896 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 248, Top: 0 ft., Bottom: 896 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8066 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 555, Top: 1150 ft., Bottom: 8082 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12499 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 307, Top: 7566 ft., Bottom: 12516 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4701 ft.
NIOBRARA7619 ft.

Formation NBRR                     Formation Classification:                       Status:  PR - 3/1/2024                  Interval Top: 8130 ft.    Interval Bottom: 12312 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/7/2011Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/27/2011
Treatment Summary:STAGE 1 – PUMPED HYBRID SYSTEM, 29,951# 40/70 SAND AND 286,639# 30/50 SAND IN 5,273 BBLS FLUID ATP 6126 PSI, ATR 50.3 BPM, ISIP 3203 PSI, 5 MIN 2636 PSI, FG.849. STAGE 2 - PUMPED HYBRID SYSTEM, 30,758# 40/70 SAND AND 284,269# 30/50 SAND IN 5,226 BBLS FLUID. ATP 5466 PSI, ATR 51.0BPM, ISIP 3075 PSI, FG.834. STAGE 3- PUMPED HYBRID SYSTEM, 30,129# 40/70 SAND AND 287,319# 30/50 SAND IN 5,244 BBLS FLUID ATP 5415 PSI, ATR 49.8 BPM, ISIP 2933 PSI, FG.815. STAGE 4 – PUMPED HYBRID SYSTEM, 30,069# 40/70 SAND AND 288,591# 30/50 SAND IN 5,228 BBLS FLUID. ATP 5405 PSI, ATR 49.1 BPM, ISIP 3391 PSI, FG.874. STAGE 5 – PUMPED HYBRID SYSTEM, 29,997# 40/70 SAND AND 283,944# 30/50 SAND IN 5,153 BBLS FLUID ATP 5140 PSI, ATR 48.4 BPM, ISIP 3305 PSI, FG.864. STAGE 6 – PUMPED HYBRID SYSTEM, 30,848# 40/70 SAND AND 288,223# 30/50 SAND IN 5,175 BBLS FLUID ATP 5332 PSI, ATR 50.8 BPM, ISIP 3385 PSI, FG.874 STAGE 7 – PUMPED HYBRID SYSTEM, 30,011# 40/70 SAND AND 196,765# 30/50 SAND IN 4,739 BBLS FLUID ATP 5827 PSI, ATR 38.3 BPM, ISIP 3831 PSI,FG.932. STAGE 8 - PUMPED HYBRID SYSTEM, 29,998# 40/70 SAND AND 270,124# 30/50 SAND IN 5,076 BBLS FLUID ATP 5663 PSI, ATR 7.4 BPM, ISIP 3851 PSI, FG.923 STAGE 9 – PUMPED HYBRID SYSTEM, 30,405# 40/70 SAND AND 8,872# 30/50 SAND IN 3,895 BBLS FLUID ATP 5769 PSI, ATR 45.7 BPM, ISIP 3639 PSI, FG.905. STAGE 10 – PUMPED HYBRID SYSTEM, 31,013# 40/70 SAND AND 261,209# 30/50 SAND IN 5,515 BBLS FLUID ATP 6193 PSI, ATR 45.7 BPM, ISIP 4052 PSI, FG.957. STAGE 11 – PUMPED HYBRID SYSTEM, 30,051# 40/70 SAND AND 264,196# 30/50 SAND IN 5,149 BBLS FLUID ATP 6128 PSI, ATR 51.5 BPM, ISIP 3796 PSI, FG.925. STAGE 12 – PUMPED HYBRID SYSTEM, 30,047# 40/70 SAND AND 288,156# 30/50 SAND IN 5,109 BBLS FLUID ATP 5454 PSI, ATR 47.08 BPM, ISIP 4092 PSI, FG.96. STAGE 13 – PUMPED HYBRID SYSTEM, 29,996# 40/70 SAND AND 209,917# 30/50 SAND IN 5,358 BBLS FLUID ATP 5513 PSI, ATR 50.1 BPM, ISIP 3859 PSI, FG.934. STAGE 14 – PUMPED HYBRID SYSTEM, 29,963# 40/70 SAND AND 288,094# 30/50 SAND IN 5,090 BBLS FLUID ATP 5530 PSI, ATR 49.8 BPM, ISIP 4002 PSI, FG.95. STAGE 15 – PUMPED HYBRID SYSTEM, 30,171# 40/70 SAND AND 241,026# 30/50 SAND IN 4,877 BBLS FLUID ATP 5543 PSI, ATR 49.5 BPM. STAGE 16 – PUMPED HYBRID SYSTEM, 30,158# 40/70 SAND AND 308,088# 30/50 SAND IN 5,195 BBLS FLUID ATP 5054 PSI, ATR 50.0 BPM. STAGE 17 – PUMPED HYBRID SYSTEM, 29,951# 40/70 SAND AND 286,639# 30/50 SAND IN 5,049 BBLS FLUID ATP 5377 PSI, ATR 52.3 BPM, ISIP 3729 PSI, 5 MIN ISIP 3125 PSI, FG.917.
Tubing Size:2.375 in.Tubing Setting Depth:7438 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/10/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1212
BBLS_OIL 403
BTU_GAS 1388
CALC_BBLS_H2O 1212
CALC_BBLS_OIL 403
CALC_GOR 4179
CALC_MCF_GAS 1484
CASING_PRESS 1900
GRAVITY_OIL 51
MCF_GAS 1484
TUBING_PRESS 1302
Perforation Data:
Interval Top:8130 ft.# Of Holes:816
Interval Bottom:12312 ft.Hole Size:2.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)1308
Total Gas Produced (MCF)10899
GOR8332
GOR DeterminationBOE
Average BOE per Day8.689
Average MCFE per Day50.396

 Federal Financial Assurance  i 

 Tribal Well  i No