|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2021 Measured TD: 8000 ft. Vertical TD: 7892 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2021 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 4/5/2013 | Prop Depth/Form: | 8021 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 560, Top: , Bottom: 800 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8021 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8021 ft. |
| | |
Wellbore Completed | Completion Date: | 7/22/2011 | Spud Date: | 7/19/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8000 ft. | Measured PB depth: | 7970 ft. | True Vertical TD: | 7892 ft. | True Vertical PB depth: | 7862 ft. | Top PZ Location: | Sec:6 Twp: 2N 65W | Footage: 53 FNL 2564 FEL | Depth | Bottom Hole Location: | Sec:6 Twp: 2N 65W | Footage: 51 FNL 2562 FEL | Depth | Log Types: | PRE FORM 5 | Log Types: | CBL
NO OPEN HOLE LOGS, WORKED THROUGH BRIDGE @ 945' COULD NOT GET PAST DOWN 1286'. | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 840 ft., Weight: 24# , Citings Type: ACTUAL | Cement: | Sacks: 530, Top: 0 ft., Bottom: 840 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7990 ft., Weight: 11.6# , Citings Type: ACTUAL | Cement: | Sacks: 225, Top: 6390 ft., Bottom: 7990 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 450 ft., Depth: 5413 ft., Bottom: 5450 ft., Sacks: 680, Method: DV TOOL | Additional Cement: | String Type: 1ST , Top: 450 ft., Depth: 5413 ft., Bottom: 5450 ft., Sacks: 680, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7165 ft. | | | | CODELL | 7424 ft. | | | | J SAND | 7852 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 7/1/2021 Interval Top: 7922 ft. Interval Bottom: 7950 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/13/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/23/2011 | Treatment Summary: | J S PERF 7922-7950 HOLES 60 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 148,344 gal Slickwater w/ 115,300# 30/50, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7922 ft. | # Of Holes: | 60 | Interval Bottom: | 7950 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 10/13/2011 Interval Top: 7226 ft. Interval Bottom: 7950 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/13/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/23/2011 | Treatment Summary: | NB PERF 7226-7324 HOLES 62 SIZE 0.42
CD PERF 7456-7472 HOLES 64 SIZE 0.42
J S PERF 7922-7950 HOLES 60 SIZE 0.42 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7880 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/13/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 10 | BTU_GAS | 1452 | CALC_BBLS_OIL | 10 | CALC_GOR | 10000 | CALC_MCF_GAS | 100 | CASING_PRESS | 1774 | GRAVITY_OIL | 53 | MCF_GAS | 100 |
| Perforation Data: | Interval Top: | 7226 ft. | # Of Holes: | 186 | Interval Bottom: | 7950 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 7/1/2021 Interval Top: 7226 ft. Interval Bottom: 7472 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/13/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/27/2011 | Treatment Summary: | NB PERF 7226-7324 HOLES 62 SIZE 0.42 CD PERF 7456-7472 HOLES 64 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 249,942 gal Slickwater w/ 201,020# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 206,052 gal Slickwater w/ 151,020# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7226 ft. | # Of Holes: | 126 | Interval Bottom: | 7472 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 06/30/2021 |
Low Producing | Y | Production Period 10/2023 - 09/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|