Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33265
Well Classification: GW Status: PA - 5/14/2021
Well Name/No:McGlothlin #8-6-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/14/2021
FacilityID:422455LocationID:319142
County:WELD #123Location:SESE 17 6N66W 6
Field:BRACEWELL - #7487Elevation:4771 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:659FSL  623 FELLat/Long: 40.482690 / -104.794670Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.482690 / -104.794660Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/5/2014
End Date: 9/5/2014
Reported: 10/10/2014
Days to report: 35
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 5/14/2021             Measured TD: 7434 ft.    Vertical TD: 7357 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 5/14/2021
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:3/30/2013
Proposed Top PZ Location:Sec:17 Twp: 6N 66W Footage: 1316 FSL  50 FEL
Bottom Hole Location:Sec:17 Twp: 6N 66W Footage: 1395 FSL  80 FEL
Proposed Depth/Form:7423 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 381-5 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 650 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 450, Top: 0 ft., Bottom: 650 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7423 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 180, Top: 6673 ft., Bottom: 7423 ft.

Wellbore Completed
Completion Date:12/2/2011
Spud Date:11/27/2011Spud Date Is:Actual
Measured TD:7434 ft.Measured PB depth:7382 ft.
True Vertical TD:7357 ft.True Vertical PB depth:7305 ft.
Top PZ Location:Sec:17 Twp: 6N 66WFootage: 1316 FSL  50 FEL
Bottom Hole Location:Sec:17 Twp: 6N 66WFootage: 1395 FSL  80 FEL
Log Types:LAS - Triple Combo High Res Den/Neu Induction
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 700 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 0 ft., Bottom: 700 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7398 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 515, Top: 2590 ft., Bottom: 7398 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2634 ft.
PARKMAN3666 ft.
SUSSEX4390 ft.
SHANNON4842 ft.
NIOBRARA6976 ft.
FORT HAYS7226 ft.
CODELL7245 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/8/2019                  Interval Top: 7247 ft.    Interval Bottom: 7259 ft.

 Completed Information for Formation CODELL
1st Production Date:1/12/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/5/2014Treatment End Date:9/5/2014
Treatment Summary:Total 190,000 lbs 20/40 White Sand, & 4,186 lbs 20/40 Propstar. Total slickwater pumped 2859 bbls. Flowback determined from well test seperator.
Total fluid used in treatment (bbls):2859Max pressure during treatment (psi):4520
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):212
Fresh water used in treatment (bbls):2859Disposition method For flowback:DISPOSAL
Total proppant used (lbs):194186Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:12/18/2011
Treatment Summary:ISIP: 3,504 psi, 1 min: 3,461 psi, 5 min: 3,350 psi, FG: 0.922 psi/ft, Leak off: 30.8 psi/min. ATP: 5393 psi, ATR: 60.3 bpm, MTP: 5904 psi, MTR: 60.7 bpm. Cln Fluid: 4130 bbls, 115,680 lbs 30/50 white sand.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7247 ft.# Of Holes:79
Interval Bottom:7259 ft.Hole Size:0.35 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 5/14/2021                 Interval Top: 6977 ft.    Interval Bottom: 7259 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/12/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 27
BTU_GAS 1254
CALC_BBLS_H2O 1
CALC_BBLS_OIL 27
CALC_GOR 5519
CALC_MCF_GAS 149
CASING_PRESS 1420
GRAVITY_OIL 51
MCF_GAS 149
TUBING_PRESS 1080
Perforation Data:
Interval Top:6977 ft.# Of Holes:94
Interval Bottom:7259 ft.Hole Size:0.35 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/23/2014                 Interval Top: 6977 ft.    Interval Bottom: 7123 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/12/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/3/2012
Treatment Summary:Total 205,940 lbs, 201,940 40/70 Ottawa, 4,000 lbs 20/40 Super LC. Pumped 0.5 ppa to 2.0 ppa in 4,372 bbls of fluid. Total fluid pumped 6,281 bbls.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6977 ft.# Of Holes:15
Interval Bottom:7123 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/14/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No