|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/28/2019 Measured TD: 8070 ft. Vertical TD: 7678 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/28/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/30/2013 | | Proposed Top PZ Location: | Sec:10 Twp: 2N 66W | Footage: 660 FSL 600 FWL | | Bottom Hole Location: | Sec:10 Twp: 2N 66W | Footage: 660 FSL 600 FWL | | Proposed Depth/Form: | 7936 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: SW/4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-66 , Unit Acreage: 160, Drill Unit: SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 390, Top: , Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7936 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 160, Top: 7328 ft., Bottom: 7936 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/19/2011 | | Spud Date: | 9/13/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8070 ft. | Measured PB depth: | 8047 ft. | | True Vertical TD: | 7678 ft. | True Vertical PB depth: | 7655 ft. | | Top PZ Location: | Sec:10 Twp: 2N 66W | Footage: 789 FSL 503 FWL | | Bottom Hole Location: | Sec:10 Twp: 2N 66W | Footage: 796 FSL 504 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1050 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 370, Top: 0 ft., Bottom: 1050 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8054 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 3680 ft., Bottom: 8054 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4830 ft. | | | | | NIOBRARA | 7617 ft. | | | | | CODELL | 7877 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 2/23/2012 Interval Top: 7877 ft. Interval Bottom: 7897 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/17/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/13/2011 | | Treatment Summary: | Frac'd the Codell 7877’ – 7897’ (40 holes) w/ 106,092 gal 22 # Vistar Hybrid cross linked gel
containing 250,500 # 20/40 sand. 10-13-11 (Form re-submittal)
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7877 ft. | # Of Holes: | 40 | | Interval Bottom: | 7897 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/28/2019 Interval Top: 7652 ft. Interval Bottom: 7897 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/17/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/27/2011 | | Treatment Summary: | Set CBP @ 7500'. 11-22-11. Drilled out CBP @ 7500', CFP @ 7750' to commingle the NBRR-CDL. 11-23-11 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7860 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/27/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 26 | | BTU_GAS | 1272 | | CALC_BBLS_H2O | 12 | | CALC_BBLS_OIL | 26 | | CALC_GOR | 14885 | | CALC_MCF_GAS | 387 | | CASING_PRESS | 255 | | GRAVITY_OIL | 47 | | MCF_GAS | 387 | | TUBING_PRESS | 108 |
| | Perforation Data: | | Interval Top: | 7652 ft. | # Of Holes: | 172 | | Interval Bottom: | 7897 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 2/23/2012 Interval Top: 7652 ft. Interval Bottom: 7685 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/17/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/13/2011 | | Treatment Summary: | Set CFP @7750'. 10-13-11. Frac'd the Niobrara 7652’ – 7685’ (132 holes), w/ 131,250 gals 18 # Vistar Hybrid
cross linked gel containing 250,140 # 20/40 sand. 10-13-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7652 ft. | # Of Holes: | 132 | | Interval Bottom: | 7685 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/28/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|