|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 7/13/2017 Measured TD: 8070 ft. Vertical TD: 8027 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 7/13/2017 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/30/2013 | | Proposed Top PZ Location: | Sec:10 Twp: 2N 66W | Footage: 578 FSL 1976 FWL | | Bottom Hole Location: | Sec:10 Twp: 2N 66W | Footage: 600 FSL 1989 FWL | | Proposed Depth/Form: | 7632 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: SW4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-32 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-66 , Unit Acreage: 160, Drill Unit: SW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 390, Top: , Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7632 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 160, Top: 7022 ft., Bottom: 7632 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/13/2011 | | Spud Date: | 9/7/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8070 ft. | Measured PB depth: | 8040 ft. | | True Vertical TD: | 8027 ft. | True Vertical PB depth: | 7997 ft. | | Top PZ Location: | Sec:10 Twp: 2N 66W | Footage: 578 FSL 1976 FWL | | Bottom Hole Location: | Sec:10 Twp: 2N 66W | Footage: 600 FSL 1989 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1048 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 385, Top: 0 ft., Bottom: 1048 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8055 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 630, Top: 3420 ft., Bottom: 8055 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4529 ft. | | | | | NIOBRARA | 7286 ft. | | | | | CODELL | 7524 ft. | | | | | J SAND | 7960 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 7/13/2017 Interval Top: 7969 ft. Interval Bottom: 8010 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/17/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/13/2011 | | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J-SAND 7969'-7975', (58 HOLES) W/151,200 GAL 18 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 253,720 # 20/40 SAND. 10/13/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7969 ft. | # Of Holes: | 58 | | Interval Bottom: | 8010 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 12/9/2011 Interval Top: 7307 ft. Interval Bottom: 8010 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 10/17/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/13/2011 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE. SET CBP @ 7230'. 11/28/11. DRILLED OUT CBP @ 7230'. 11-29-11. DRILLED OUT CFP @ 7410' AND 7650' TO COMMINGLE THE JSND-NBRR-CDL. 11/29/11. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7967 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/9/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 27 | | BBLS_OIL | 149 | | BTU_GAS | 1272 | | CALC_BBLS_H2O | 27 | | CALC_BBLS_OIL | 149 | | CALC_GOR | 2852 | | CALC_MCF_GAS | 425 | | CASING_PRESS | 272 | | GRAVITY_OIL | 1 | | MCF_GAS | 425 | | TUBING_PRESS | 925 |
| | Perforation Data: | | Interval Top: | 7307 ft. | # Of Holes: | 136 | | Interval Bottom: | 8010 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/13/2017 Interval Top: 7307 ft. Interval Bottom: 7545 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/17/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/13/2011 | | Treatment Summary: | CDL-NBRR COMPLETION. SET CFP @ 7650’. 10/13/2011. FRAC’D THE CODELL 7524’-7545’, (42 HOLES) W/108,612 GAL 22 # VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,260# 20/40 SAND. 10/13/11. SET CFP @ 7410’. 10/13/11. FRAC’D THE NIOBRARA 7307’-7316’ (36 HOLES), W/130,200 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,340 # 20/40 SAND. 10/13/11. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7307 ft. | # Of Holes: | 78 | | Interval Bottom: | 7545 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/13/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|