|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 8/27/2024 Measured TD: 10846 ft. Vertical TD: 6871 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 8/27/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/30/2013 | | Proposed Top PZ Location: | Sec:8 Twp: 4N 64W | Footage: 71 FSL 1152 FWL | | Bottom Hole Location: | Sec:8 Twp: 4N 64W | Footage: 145 FSL 1123 FEL | | Proposed Depth/Form: | 10829 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 16 in., Size: 15 in., Top: 0 ft., Depth: 100 ft., Weight: 0 , Citings Type: PLANNED | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 600 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 189, Top: 0 ft., Bottom: 600 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7208 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 637, Top: 0 ft., Bottom: 7208 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6036 ft., Depth: 10829 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: 10829 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/22/2011 | | Spud Date: | 9/8/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 10846 ft. | Measured PB depth: | 10823 ft. | | True Vertical TD: | 6871 ft. | True Vertical PB depth: | 6871 ft. | | Top PZ Location: | Sec:8 Twp: 4N 64W | Footage: 71 FSL 1152 FWL | | Bottom Hole Location: | Sec:8 Twp: 4N 64W | Footage: 145 FSL 1123 FEL | | Log Types: | CBL/GRL/CCL/VDL. | | Casing: | String Type: CONDUCTOR, Hole Size: 18.5 in., Size: 16 in., Top: 0 ft., Depth: 124 ft., Weight: 84.00 , Citings Type: ACTUAL | | Cement: | Sacks: 6, Top: 0 ft., Bottom: 124 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 714 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 385, Top: 0 ft., Bottom: 714 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7338 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 640, Top: 714 ft., Bottom: 7338 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6214 ft., Depth: 10831 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4810 ft. | | | | | SHANNON | 4957 ft. | | | | | NIOBRARA | 7008 ft. | | | |
Formation NBRR Formation Classification: OW Status: AB - 8/27/2024 Interval Top: 7463 ft. Interval Bottom: 10751 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/16/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/18/2013 | Treatment End Date: | 11/19/2013 | | Treatment Summary: | RE-FRAC W/2370939 GALS VISTAR AND SLICK WATER AND 2929829# OTTAWA SAND | | Total fluid used in treatment (bbls): | 56451 | Max pressure during treatment (psi): | 6407 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 18 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.82 | | Recycled water used in treatment (bbls): | 3269 | Total flowback volume recovered (bbls): | 3661 | | Fresh water used in treatment (bbls): | 53182 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 2929829 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 10/14/2011 | | Treatment Summary: | Frac'd the Niobrara w/ 1878160.67 gals of Silverstim and Slick Water with 3,300,020.2#'s of Ottawa sand. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 112 | | BBLS_OIL | 76 | | BTU_GAS | 1242 | | CALC_BBLS_H2O | 112 | | CALC_BBLS_OIL | 76 | | CALC_GOR | 10197 | | CALC_MCF_GAS | 775 | | CASING_PRESS | 947 | | GRAVITY_OIL | 56 | | MCF_GAS | 775 | | TUBING_PRESS | 550 |
| | Perforation Data: | | Interval Top: | 7463 ft. | # Of Holes: | 18 | | Interval Bottom: | 10751 ft. | Hole Size: | 0 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/27/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|