|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 9/26/2023 Measured TD: 8422 ft. Vertical TD: 8043 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 9/26/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/23/2013 | | Proposed Top PZ Location: | Sec:32 Twp: 2N 66W | Footage: 50 FNL 50 FEL | | Bottom Hole Location: | Sec:32 Twp: 2N 66W | Footage: 50 FNL 50 FEL | | Proposed Depth/Form: | 8369 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 880 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 880 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8369 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8369 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/22/2011 | | Spud Date: | 6/18/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8422 ft. | Measured PB depth: | 8380 ft. | | True Vertical TD: | 8043 ft. | True Vertical PB depth: | 8001 ft. | | Top PZ Location: | Sec:32 Twp: 2N 66W | Footage: 49 FNL 50 FEL | | Bottom Hole Location: | Sec:32 Twp: 2N 66W | Footage: 42 FNL 43 FEL | | Log Types: | CBL
NO OPEN HOLE LOGS, BRIDGED OUT 1380'. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 909 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 909 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8414 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 229, Top: 6880 ft., Bottom: 8414 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5725 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 719, Top: 740 ft., Bottom: 5725 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4368 ft. | | | | | SUSSEX | 4767 ft. | | | | | NIOBRARA | 7509 ft. | | | | | FORT HAYS | 7819 ft. | | | | | CODELL | 7830 ft. | | | | | J SAND | 8270 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 9/26/2023 Interval Top: 8260 ft. Interval Bottom: 8280 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/24/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/16/2011 | | Treatment Summary: | J S PERF 8260-8280 HOLES 60 SIZE 0.38
Frac J-Sand down 4-1/2" Csg w/ 147,840 gal Slickwater w/ 115,380# 40/70, 4,000# SuperLC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8260 ft. | # Of Holes: | 60 | | Interval Bottom: | 8280 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: Status: CM - 1/26/2012 Interval Top: 7640 ft. Interval Bottom: 8280 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/24/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/16/2011 | | Treatment Summary: | NB PERF 7640-7706 HOLES 72 SIZE 0.42
CD PERF 7796-7816 HOLES 60 SIZE 0.42
J S PERF 8260-8280 HOLES 60 SIZE 0.38 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8222 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/26/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 200 | | BTU_GAS | 1266 | | CALC_BBLS_OIL | 200 | | CALC_GOR | 600 | | CALC_MCF_GAS | 120 | | CASING_PRESS | 2005 | | GRAVITY_OIL | 49 | | MCF_GAS | 120 |
| | Perforation Data: | | Interval Top: | 7640 ft. | # Of Holes: | 192 | | Interval Bottom: | 8280 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/26/2023 Interval Top: 7640 ft. Interval Bottom: 7816 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/24/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/21/2011 | | Treatment Summary: | NB PERF 7640-7706 HOLES 72 SIZE 0.42 CD PERF 7796-7816 HOLES 60 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 217,352 gal Slickwater w/ 152,960# 40/70, 4,000# SuperLC
Frac Codell down 4-1/2" Csg w/ 202,188 gal Slickwater w/ 150,480# 40/70, 4,000# SuperLC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7640 ft. | # Of Holes: | 132 | | Interval Bottom: | 7816 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/26/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|