|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 9/6/2024 Measured TD: 8159 ft. Vertical TD: 8094 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 9/6/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/23/2013 | | Proposed Top PZ Location: | Sec:32 Twp: 2N 66W | Footage: 1980 FNL 660 FEL | | Bottom Hole Location: | Sec:32 Twp: 2N 66W | Footage: 1980 FNL 660 FEL | | Proposed Depth/Form: | 8080 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 880 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 880 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8080 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8080 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/26/2011 | | Spud Date: | 6/22/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8159 ft. | Measured PB depth: | 8131 ft. | | True Vertical TD: | 8094 ft. | True Vertical PB depth: | 8066 ft. | | Top PZ Location: | Sec:32 Twp: 2N 66W | Footage: 1976 FNL 659 FEL | | Bottom Hole Location: | Sec:32 Twp: 2N 66W | Footage: 1986 FNL 653 FEL | | Log Types: | P/E AILC-CNLD-ML-CL/CV; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 904 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 0 ft., Bottom: 904 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8147 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 234, Top: 6735 ft., Bottom: 8147 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5516 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 693, Top: 920 ft., Bottom: 5540 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4206 ft. | | | | | SUSSEX | 4600 ft. | 4882 ft. | | | | NIOBRARA | 7306 ft. | | | | | FORT HAYS | 7517 ft. | | | | | CODELL | 7540 ft. | | | | | J SAND | 7992 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 9/6/2024 Interval Top: 8018 ft. Interval Bottom: 8044 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/24/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/13/2011 | | Treatment Summary: | J S PERF 8018-8044 HOLES 52 SIZE 0.38
Frac J-Sand down 4-1/2" Csg w/ 147,378 gal Slickwater w/ 115,000# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8018 ft. | # Of Holes: | 52 | | Interval Bottom: | 8044 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: Status: CM - 1/26/2012 Interval Top: 7306 ft. Interval Bottom: 8044 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/24/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/13/2011 | | Treatment Summary: | NB PERF 7306-7394 HOLES 58 SIZE 0.42
CD PERF 7542-7560 HOLES 54 SIZE 0.42
J S PERF 8018-8044 HOLES 52 SIZE 0.38 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7981 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/26/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 80 | | BTU_GAS | 1266 | | CALC_BBLS_OIL | 80 | | CALC_GOR | 1125 | | CALC_MCF_GAS | 90 | | CASING_PRESS | 2300 | | GRAVITY_OIL | 49 | | MCF_GAS | 90 |
| | Perforation Data: | | Interval Top: | 7306 ft. | # Of Holes: | 164 | | Interval Bottom: | 8044 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/6/2024 Interval Top: 7306 ft. Interval Bottom: 7560 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/24/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/24/2011 | | Treatment Summary: | NB PERF 7306-7394 HOLES 58 SIZE 0.42 CD PERF 7542-7560 HOLES 54 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 243,638 gal Slickwater w/ 200,300# 40/70, 4,000# SuperLC
Frac Codell down 4-1/2" Csg w/ 200,880 gal Slickwater w/ 150,780# 40/70, 4,000# SuperLC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7306 ft. | # Of Holes: | 112 | | Interval Bottom: | 7560 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/06/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|