|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 9/6/2024 Measured TD: 8194 ft. Vertical TD: 8071 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 9/6/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/23/2013 | | Proposed Top PZ Location: | Sec:32 Twp: 2N 66W | Footage: 2580 FNL 1230 FEL | | Bottom Hole Location: | Sec:32 Twp: 2N 66W | Footage: 2580 FNL 1230 FEL | | Proposed Depth/Form: | 8136 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 880 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 880 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8136 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8136 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/4/2011 | | Spud Date: | 7/1/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8194 ft. | Measured PB depth: | 8160 ft. | | True Vertical TD: | 8071 ft. | True Vertical PB depth: | 8037 ft. | | Top PZ Location: | Sec:32 Twp: 2N 66W | Footage: 2576 FNL 1226 FEL | | Bottom Hole Location: | Sec:32 Twp: 2N 66W | Footage: 2583 FNL 1215 FEL | | Log Types: | CBL
NO OPEN HOLE LOGS, BRIDGED OUT AT 927'. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 921 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 921 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8184 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 96, Top: 7852 ft., Bottom: 8184 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7848 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 970, Top: 913 ft., Bottom: 7852 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7340 ft. | | | | | CODELL | 7584 ft. | | | | | J SAND | 8052 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 9/6/2024 Interval Top: 8052 ft. Interval Bottom: 8078 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/24/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/16/2011 | | Treatment Summary: | J S PERF 8052-8078 HOLES 52 SIZE 0.38
Frac J-Sand down 4-1/2" Csg w/ 147,588 gal Slickwater w/ 115,460# 40/70, 4,000# SuperLC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8052 ft. | # Of Holes: | 52 | | Interval Bottom: | 8078 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: Status: CM - 1/26/2012 Interval Top: 7348 ft. Interval Bottom: 8078 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/24/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/16/2011 | | Treatment Summary: | NB PERF 7348-7436 HOLES 48 SIZE 0.42
CD PERF 7584-7602 HOLES 54 SIZE 0.42
J S PERF 8052-8078 HOLES 52 SIZE 0.38 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/26/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 100 | | BTU_GAS | 1266 | | CALC_BBLS_OIL | 100 | | CALC_GOR | 1180 | | CALC_MCF_GAS | 118 | | CASING_PRESS | 1525 | | GRAVITY_OIL | 49 | | MCF_GAS | 118 |
| | Perforation Data: | | Interval Top: | 7348 ft. | # Of Holes: | 154 | | Interval Bottom: | 8078 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/6/2024 Interval Top: 7348 ft. Interval Bottom: 7602 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/24/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/27/2011 | | Treatment Summary: | NB PERF 7348-7436 HOLES 48 SIZE 0.42 CD PERF 7584-7602 HOLES 54 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 243,056 gal Slickwater w/ 200,360# 40/70, 4,000# SuperLC
Frac Codell down 4-1/2" Csg w/ 204,876 gal Slickwater w/ 150,580# 40/70, 4,000# SuperLC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7348 ft. | # Of Holes: | 102 | | Interval Bottom: | 7602 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/06/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|