|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 9/30/2019 Measured TD: 6721 ft. Vertical TD: 6709 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 9/30/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 3/20/2013 | Proposed Top PZ Location: | Sec:29 Twp: 5N 62W | Footage: 1323 FSL 1364 FEL | Bottom Hole Location: | Sec:29 Twp: 5N 62W | Footage: 1323 FSL 1364 FEL | Proposed Depth/Form: | 6750 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: SW/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 410 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 290, Top: 0 ft., Bottom: 410 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6750 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 5900 ft., Bottom: 6750 ft. |
| | |
Wellbore Completed | Completion Date: | 5/9/2011 | Spud Date: | 5/5/2011 | Spud Date Is: | ACTUAL | Measured TD: | 6721 ft. | Measured PB depth: | 6703 ft. | True Vertical TD: | 6709 ft. | True Vertical PB depth: | 6691 ft. | Top PZ Location: | Sec:29 Twp: 5N 62W | Footage: 1323 FSL 1364 FEL | Bottom Hole Location: | Sec:29 Twp: 5N 62W | Footage: 1323 S 1364 E | Log Types: | CBL,GR,CD,CN,DI | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 8.625 in., Top: 0 ft., Depth: 440 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 430, Top: 0 ft., Bottom: 440 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6712 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 500, Top: 3000 ft., Bottom: 6712 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3353 ft. | | | | SUSSEX | 4043 ft. | | | | NIOBRARA | 6219 ft. | | | | FORT HAYS | 6457 ft. | | | | CODELL | 6481 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 10/2/2019 Interval Top: 6495 ft. Interval Bottom: 6503 ft. Completed Information for Formation CODELL | 1st Production Date: | 6/22/2011 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 6495 ft. | # Of Holes: | 32 | Interval Bottom: | 6503 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: OW Status: TA - 9/30/2019 Interval Top: 6236 ft. Interval Bottom: 6503 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 6/22/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/11/2011 | Treatment Summary: | CODELL PUMPED 39,732 GAL PAD FLUID. PUMPED 84,210 GAL PHASERFRAC W/250,000 LBS 20/40 SAND. ISDP 3117 PSI, ATP 3827 PSI, ATR 22.2 BPM. NIOBRARA PUMPED 25,410 PAD FLUID. PUMPED 92,484 GAL PHASERFRAC W/260,480 LBS 30/50 SAND. ISDP 3026 PSI, ATP 3859 PSI, ATR 50.9 BPM. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 25 | BTU_GAS | 1283 | CALC_BBLS_H2O | 2 | CALC_BBLS_OIL | 25 | CALC_MCF_GAS | 28 | CASING_PRESS | 211 | GRAVITY_OIL | 41 | MCF_GAS | 28 |
| Perforation Data: | Interval Top: | 6236 ft. | # Of Holes: | 80 | Interval Bottom: | 6503 ft. | Hole Size: | 0.4 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/2/2019 Interval Top: 6236 ft. Interval Bottom: 6390 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 6/22/2011 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6236 ft. | # Of Holes: | 48 | Interval Bottom: | 6390 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2029 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (TA ) | Y | Defined Inactive 09/30/2019 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|