|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 9/30/2019 Measured TD: 6720 ft. Vertical TD: 6619 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 9/30/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 3/20/2013 | Proposed Top PZ Location: | Sec:29 Twp: 5N 62W | Footage: 658 FSL 1969 FWL | Bottom Hole Location: | Sec:29 Twp: 5N 62W | Footage: 658 FSL 1969 FWL | Proposed Depth/Form: | 6800 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 40, Drill Unit: SESW | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 410 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 290, Top: 0 ft., Bottom: 410 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6800 ft., Weight: 11.5 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 0 ft., Bottom: 6800 ft. |
| | |
Wellbore Completed | Completion Date: | 5/18/2011 | Spud Date: | 5/14/2011 | Spud Date Is: | ACTUAL | Measured TD: | 6720 ft. | Measured PB depth: | 6687 ft. | True Vertical TD: | 6619 ft. | True Vertical PB depth: | 6586 ft. | Top PZ Location: | Sec:29 Twp: 5N 62W | Footage: 658 FSL 1969 FWL | Bottom Hole Location: | Sec:29 Twp: 5N 62W | Footage: 658 S 1969 W | Log Types: | CBL, GR, CD, CN, DI | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 8.625 in., Top: 0 ft., Depth: 447 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 440, Top: 0 ft., Bottom: 447 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6701 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 505, Top: 2780 ft., Bottom: 6701 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3317 ft. | | | | SUSSEX | 4020 ft. | | | | NIOBRARA | 6212 ft. | | | | FORT HAYS | 6447 ft. | | | | CODELL | 6472 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 10/2/2019 Interval Top: 6574 ft. Interval Bottom: 6582 ft. Completed Information for Formation CODELL | 1st Production Date: | 7/4/2011 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 6574 ft. | # Of Holes: | 32 | Interval Bottom: | 6582 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: GW Status: TA - 9/30/2019 Interval Top: 6316 ft. Interval Bottom: 6582 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 7/4/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/25/2011 | Treatment Summary: | CODELL PUMPED 32,466 GAL PAD FLUID. PUMPED 109,242 GAL PHASERFRAC W/250,340 LBS 20/40 SAND. ISDP 2914 PSI, ATP 2959 PSI, ATR 22.8 BPM. NIOBRARA PUMPED 19,530 PAD FLUID. PUMPED 121,086 GAL PHASERFRAC W/260,140 LBS. 30/50 SAND. ISDP 3048 PSI, ATP 3931 PSI, ATR 49.1 BPM. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 2 | BBLS_OIL | 29 | BTU_GAS | 1283 | CALC_BBLS_H2O | 2 | CALC_BBLS_OIL | 29 | CALC_MCF_GAS | 20 | CASING_PRESS | 175 | GRAVITY_OIL | 40 | MCF_GAS | 20 |
| Perforation Data: | Interval Top: | 6316 ft. | # Of Holes: | 80 | Interval Bottom: | 6582 ft. | Hole Size: | 0.4 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/2/2019 Interval Top: 6316 ft. Interval Bottom: 6470 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 7/4/2011 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6316 ft. | # Of Holes: | 48 | Interval Bottom: | 6470 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2029 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (TA ) | Y | Defined Inactive 09/30/2019 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|