|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/9/2023 Measured TD: 8320 ft. Vertical TD: 8077 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/9/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 3/10/2013 | Proposed Top PZ Location: | Sec:32 Twp: 2N 66W | Footage: 1100 FSL 2510 FEL | Bottom Hole Location: | Sec:32 Twp: 2N 66W | Footage: 1100 FSL 2510 FEL | Proposed Depth/Form: | 8273 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 560, Top: 0 ft., Bottom: 850 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8273 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8273 ft. |
| | |
Wellbore Completed | Completion Date: | 6/12/2011 | Spud Date: | 5/4/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8320 ft. | Measured PB depth: | 8288 ft. | True Vertical TD: | 8077 ft. | True Vertical PB depth: | 8044 ft. | Top PZ Location: | Sec:32 Twp: 2N 66W | Footage: 1096 FSL 2524 FEL | Bottom Hole Location: | Sec:32 Twp: 2N 66W | Footage: 1120 FSL 2565 FEL | Log Types: | PRE FORM 5 | Log Types: | P/E AILC, CNLD, ML, CL/CV; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 905 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 570, Top: 0 ft., Bottom: 905 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8310 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 240, Top: 8011 ft., Bottom: 8310 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8011 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 835, Top: 190 ft., Bottom: 8011 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4307 ft. | | | | SUSSEX | 4625 ft. | | | | NIOBRARA | 7424 ft. | | | | FORT HAYS | 7722 ft. | | | | CODELL | 7746 ft. | | | | J SAND | 8150 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 10/9/2023 Interval Top: 8160 ft. Interval Bottom: 8190 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/20/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/28/2011 | Treatment Summary: | J S PERF 8160-8190 TOTAL 66 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 144,186 gal Slickwater w/ 115,760# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8160 ft. | # Of Holes: | 66 | Interval Bottom: | 8190 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/20/2011 Interval Top: 7522 ft. Interval Bottom: 8190 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/20/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/28/2011 | Treatment Summary: | NB PERF 7522-7610 TOTAL 60 SIZE 0.47
CD PERF 7748-7764 TOTAL 64 SIZE 0.42
J S PERF 8160-8190 TOTAL 66 SIZE 0.42 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/20/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 2 | BTU_GAS | 1164 | CALC_BBLS_OIL | 2 | CALC_GOR | 6000 | CALC_MCF_GAS | 12 | CASING_PRESS | 1350 | GRAVITY_OIL | 47 | MCF_GAS | 12 |
| Perforation Data: | Interval Top: | 7522 ft. | # Of Holes: | 190 | Interval Bottom: | 8190 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/9/2023 Interval Top: 7522 ft. Interval Bottom: 7764 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/20/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/4/2011 | Treatment Summary: | NB PERF 7522-7610 TOTAL 60 SIZE 0.47 CD PERF 7748-7764 TOTAL 64 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 246,164 gal Slickwater w/ 200,540# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 192,486 gal Slickwater w/ 150,460# 40/70, 4000# SB Exce |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7522 ft. | # Of Holes: | 124 | Interval Bottom: | 7764 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 10/09/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|