|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/9/2023 Measured TD: 8594 ft. Vertical TD: 8062 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/9/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 3/10/2013 | Proposed Top PZ Location: | Sec:32 Twp: 2N 66W | Footage: 50 FSL 2570 FEL | Bottom Hole Location: | Sec:32 Twp: 2N 66W | Footage: 50 FSL 2570 FEL | Proposed Depth/Form: | 8529 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 560, Top: 0 ft., Bottom: 850 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8529 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8529 ft. |
| | |
Wellbore Completed | Completion Date: | 6/9/2011 | Spud Date: | 5/4/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8594 ft. | Measured PB depth: | 8559 ft. | True Vertical TD: | 8062 ft. | True Vertical PB depth: | 8027 ft. | Top PZ Location: | Sec:32 Twp: 2N 66W | Footage: 68 FSL 2545 FEL | Bottom Hole Location: | Sec:32 Twp: 2N 66W | Footage: 61 FSL 2555 FEL | Log Types: | PRE FORM 5 | Log Types: | CBL
NO OPEN HOLE LOGS, BRIDGED OUT @ 1467' | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 907 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 570, Top: 0 ft., Bottom: 907 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8577 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1155, Top: 380 ft., Bottom: 8577 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 365 ft., Depth: 8306 ft., Bottom: 8306 ft., Sacks: 1055, Method: DV TOOL | Additional Cement: | String Type: 1ST , Top: 365 ft., Depth: 8282 ft., Bottom: 8285 ft., Sacks: 1055, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4419 ft. | | | | SUSSEX | 4794 ft. | | | | NIOBRARA | 7706 ft. | | | | FORT HAYS | 7962 ft. | | | | CODELL | 7987 ft. | | | | J SAND | 8430 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 10/9/2023 Interval Top: 8448 ft. Interval Bottom: 8482 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/20/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/28/2011 | Treatment Summary: | J S PERF 8448-8482 HOLES 56 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 146,664 gal Slickwater w/ 115,360# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8448 ft. | # Of Holes: | 56 | Interval Bottom: | 8482 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/20/2011 Interval Top: 7760 ft. Interval Bottom: 8482 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/20/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/26/2011 | Treatment Summary: | NB PERF 7760-7852 HOLES 56 SIZE 0.42
CD PERF 7998-8016 HOLES 54 SIZE 0.42
J S PERF 8448-8482 HOLES 56 SIZE 0.42 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/20/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 4 | BTU_GAS | 1164 | CALC_BBLS_OIL | 4 | CALC_GOR | 6250 | CALC_MCF_GAS | 25 | CASING_PRESS | 1325 | GRAVITY_OIL | 47 | MCF_GAS | 25 |
| Perforation Data: | Interval Top: | 7760 ft. | # Of Holes: | 166 | Interval Bottom: | 8482 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/9/2023 Interval Top: 7760 ft. Interval Bottom: 8016 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/20/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/11/2011 | Treatment Summary: | NB PERF 7760-7852 HOLES 56 SIZE 0.42 CD PERF 7998-8016 HOLES 54 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 235,158 gal Slickwater w/ 200,420# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 197,022 gal Slickwater w/ 150,240# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7760 ft. | # Of Holes: | 110 | Interval Bottom: | 8016 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 10/09/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|