|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/9/2023 Measured TD: 8198 ft. Vertical TD: 8078 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/9/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 3/10/2013 | Proposed Top PZ Location: | Sec:32 Twp: 2N 66W | Footage: 2130 FSL 660 FEL | Bottom Hole Location: | Sec:32 Twp: 2N 66W | Footage: 2130 FSL 660 FEL | Proposed Depth/Form: | 8133 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 850 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 560, Top: 0 ft., Bottom: 850 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8133 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: 0 ft., Bottom: 8133 ft. |
| | |
Wellbore Completed | Completion Date: | 5/21/2011 | Spud Date: | 5/9/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8198 ft. | Measured PB depth: | 8155 ft. | True Vertical TD: | 8078 ft. | True Vertical PB depth: | 8035 ft. | Top PZ Location: | Sec:32 Twp: 2N 66W | Footage: 2122 FSL 648 FEL | Bottom Hole Location: | Sec:32 Twp: 2N 66W | Footage: 2122 FSL 647 FEL | Log Types: | PRE FORM 5 | Log Types: | CBL
NO OPEN HOLE LOGS, BRIDGED OUT @ 5100' | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 883 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 560, Top: 0 ft., Bottom: 883 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8191 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 237, Top: 6880 ft., Bottom: 8191 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 4634 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 676, Top: 100 ft., Bottom: 4746 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7358 ft. | | | | CODELL | 7582 ft. | | | | J SAND | 8042 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 10/9/2023 Interval Top: 8042 ft. Interval Bottom: 8078 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/20/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/28/2011 | Treatment Summary: | J S PERF 8042-8078 TOTAL 52 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 148,134 gal Slickwater w/ 115,220# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8042 ft. | # Of Holes: | 52 | Interval Bottom: | 8078 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/20/2011 Interval Top: 7358 ft. Interval Bottom: 8078 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 10/20/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/28/2011 | Treatment Summary: | NB PERF 7358-7424 TOTAL 60 SIZE 0.42
CD PERF 7582-7600 TOTAL 54 SIZE 0.42
J S PERF 8042-8078 TOTAL 52 SIZE 0.42 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8023 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/20/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 11 | BTU_GAS | 1164 | CALC_BBLS_OIL | 11 | CALC_GOR | 5818 | CALC_MCF_GAS | 64 | CASING_PRESS | 1300 | GRAVITY_OIL | 47 | MCF_GAS | 64 |
| Perforation Data: | Interval Top: | 7358 ft. | # Of Holes: | 166 | Interval Bottom: | 8078 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/9/2023 Interval Top: 7358 ft. Interval Bottom: 7600 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/20/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/8/2011 | Treatment Summary: | NB PERF 7358-7424 TOTAL 60 SIZE 0.42 CD PERF 7582-7600 TOTAL 54 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 233,533 gal Slickwater w/ 200,460# 40/70, 4,000# SB Excel
Frac Codell down 4-1/2" Csg w/ 202,459 gal Slickwater w/ 150,260# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7358 ft. | # Of Holes: | 114 | Interval Bottom: | 7600 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 10/09/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|