|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/24/2019 Measured TD: 7805 ft. Vertical TD: 7704 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/24/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/6/2013 | | Proposed Top PZ Location: | Sec:3 Twp: 3N 65W | Footage: 94 FNL 2573 FWL | | Bottom Hole Location: | Sec:3 Twp: 3N 65W | Footage: 95 FNL 2584 FWL | | Proposed Depth/Form: | 7930 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 260, Top: 0 ft., Bottom: 600 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.043 in., Top: 0 ft., Depth: 7395 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 180, Top: 6707 ft., Bottom: 7395 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/27/2011 | | Spud Date: | 11/21/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7805 ft. | Measured PB depth: | 7728 ft. | | True Vertical TD: | 7704 ft. | True Vertical PB depth: | 7627 ft. | | Top PZ Location: | Sec:3 Twp: 3N 65W | Footage: 94 FNL 2573 FWL | | Bottom Hole Location: | Sec:3 Twp: 3N 65W | Footage: 95 FNL 2584 FWL | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 629 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 0 ft., Bottom: 629 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7790 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 605, Top: 3300 ft., Bottom: 7790 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4422 ft. | | | | | NIOBRARA | 6914 ft. | | | | | CODELL | 7190 ft. | | | | | J SAND | 7643 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 10/24/2019 Interval Top: 7670 ft. Interval Bottom: 7695 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/17/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/17/2011 | | Treatment Summary: | Frac'd the J-Sand 7670’– 7695’, (50 holes) w/ 59,766 gal 18 # pHaserFrac Hybrid
cross linked gel containing 251,980# 20/40 Sand. 12-17-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7670 ft. | # Of Holes: | 50 | | Interval Bottom: | 7695 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/8/2012 Interval Top: 7190 ft. Interval Bottom: 7206 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/17/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/17/2011 | | Treatment Summary: | Set CFP @ 7260'. 12-17-11
Frac'd the Codell 7190’ – 7206’, (32 holes) w/ 89,712 gal 22 # pHaserFrac Hybrid cross
linked gel containing 250,120 # 30/50 sand. 12-17-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7190 ft. | # Of Holes: | 32 | | Interval Bottom: | 7206 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 4/1/2012 Interval Top: 7054 ft. Interval Bottom: 7695 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/17/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/1/2012 | | Treatment Summary: | Drilled out CFP's to commingle the JSND-NBRR-CDL. 03-29-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7016 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/1/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 11 | | BBLS_OIL | 20 | | BTU_GAS | 1270 | | CALC_BBLS_H2O | 11 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 26600 | | CALC_MCF_GAS | 532 | | CASING_PRESS | 689 | | GRAVITY_OIL | 60 | | MCF_GAS | 532 | | TUBING_PRESS | 429 |
| | Perforation Data: | | Interval Top: | 7054 ft. | # Of Holes: | 174 | | Interval Bottom: | 7695 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/24/2019 Interval Top: 7054 ft. Interval Bottom: 7206 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/17/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7054 ft. | # Of Holes: | 124 | | Interval Bottom: | 7206 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 11/8/2012 Interval Top: 7054 ft. Interval Bottom: 7086 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/17/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/17/2011 | | Treatment Summary: | Set CFP @ 7130'. 12-17-11
Frac'd the Niobrara 7054’ – 7086’ (92 holes), w/ 100,800 gals 18 # pHaserFrac Hybrid
cross linked gel containing 250,800# 30/50 sand. 12-17-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7054 ft. | # Of Holes: | 92 | | Interval Bottom: | 7086 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/24/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|