Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33067
Well Classification: OW Status: TA - 3/12/2020
Well Name/No:TIMBRO FEDERAL #LD08-62HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date3/12/2020
FacilityID:421807LocationID:421826
County:WELD #123Location:SESE 8 9N58W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4788 ft.
Planned Location:501FSL  501 FELLat/Long: 40.759947 / -103.880650Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.759950 / -103.880660Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/18/2012
End Date: 8/19/2012
Reported: 7/15/2013
Days to report: 330
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 3/12/2020             Measured TD: 9269 ft.    Vertical TD: 5839 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 3/12/2020
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:3/1/2013
Prop Depth/Form:10074 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-3 , Unit Acreage: 640, Drill Unit: ALL
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 420, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6093 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 0 ft., Bottom: 6093 ft.
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5343 ft., Depth: 10310 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 305, Top: 5343 ft., Bottom: 10310 ft.
Casing:String Type: 2ND LINER, Hole Size: 4 in., Size: 3.5 in., Top: 6100 ft., Depth: 9131 ft., Weight: 9.3 , Citings Type: PLANNED
Cement:Sacks: 125, Top: 6135 ft., Bottom: 9131 ft.

Wellbore Completed
Completion Date:8/8/2012
Spud Date:7/25/2012Spud Date Is:ACTUAL
Measured TD:9269 ft.Measured PB depth:9162 ft.
True Vertical TD:5839 ft.True Vertical PB depth:5732 ft.
Top PZ Location:Sec:8 Twp: 9N 58WFootage: 675 FSL  849 FELDepth
Bottom Hole Location:Sec:8 Twp: 9N 58WFootage: 718 FSL  1502 FWLDepth
Log Types:CBL/CCL/GRL, Gamma-MD-TVD
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 130 ft., Weight: 42.05 , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1595 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 581, Top: 0 ft., Bottom: 1595 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 6235 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 1664 ft., Bottom: 6235 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6135 ft., Depth: 9164 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Casing:String Type: 2ND LINER, Hole Size: , Size: 3.5 in., Top: 6085 ft., Depth: 9131 ft., Weight: 9.3 , Citings Type: ACTUAL
Cement:Sacks: 162, Top: 6100 ft., Bottom: 9131 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS5739 ft.
NIOBRARA5904 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  TA - 3/12/2020                 Interval Top: 6415 ft.    Interval Bottom: 8991 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/29/2012Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/12/2015Treatment End Date:8/16/2015
Treatment Summary:Frac'd the Niobrara w/ 1760766 gals of Silverstim and Slick Water with 2290555#'s of Ottawa sand.
Total fluid used in treatment (bbls):41923Max pressure during treatment (psi):5609
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.76
Recycled water used in treatment (bbls):2597Total flowback volume recovered (bbls):140
Fresh water used in treatment (bbls):39325Disposition method For flowback:RECYCLE
Total proppant used (lbs):2290555Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/18/2012Treatment End Date:8/18/2012
Treatment Summary:Frac'd the Niobrara w/ 1677898 gals of Silvestim and Slick Water with 2,360,100#'s of Ottawa sand.
Total fluid used in treatment (bbls):82395Max pressure during treatment (psi):4949
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:16
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):42445Total flowback volume recovered (bbls):9555
Fresh water used in treatment (bbls):39949Disposition method For flowback:RECYCLE
Total proppant used (lbs):2282776Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 372
BBLS_OIL 109
BTU_GAS 1342
CALC_BBLS_H2O 372
CALC_BBLS_OIL 109
CALC_GOR 2155
CALC_MCF_GAS 235
CASING_PRESS 749
GRAVITY_OIL 39
MCF_GAS 235
TUBING_PRESS 231
Perforation Data:
Interval Top:6415 ft.# Of Holes:256
Interval Bottom:8991 ft.Hole Size:
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedYCut and Cap Date
03/04/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
07/31/2019
Low ProducingYProduction Period
08/2023 - 07/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No