|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 11/27/2023 Measured TD: 7792 ft. Vertical TD: 7687 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/27/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/26/2013 | | Proposed Top PZ Location: | Sec:2 Twp: 3N 65W | Footage: 1391 FSL 1799 FEL | | Bottom Hole Location: | Sec:2 Twp: 3N 65W | Footage: 1377 FSL 1828 FEL | | Proposed Depth/Form: | 7754 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 640 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7754 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 270, Top: 6711 ft., Bottom: 7754 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/13/2011 | | Spud Date: | 12/5/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7792 ft. | Measured PB depth: | 7782 ft. | | True Vertical TD: | 7687 ft. | True Vertical PB depth: | 7677 ft. | | Top PZ Location: | Sec:2 Twp: 3N 65W | Footage: 1391 FSL 1799 FEL | | Bottom Hole Location: | Sec:2 Twp: 3N 65W | Footage: 1377 FSL 1828 FEL | | Log Types: | CBL, Dual Ind/Compensated Density/Compensated Neutron | | Casing: | String Type: SURF, Hole Size: , Size: 13.375 in., Top: 0 ft., Depth: 673 ft., Weight: 54.5 , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 0 ft., Bottom: 673 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7775 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 630, Top: 3065 ft., Bottom: 7775 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4424 ft. | | | | | NIOBRARA | 6996 ft. | | | | | J SAND | 7619 ft. | | | |
Formation JSND Formation Classification: Status: AB - 11/27/2023 Interval Top: 7640 ft. Interval Bottom: 7670 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/3/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/29/2011 | | Treatment Summary: | Frac'd the J-Sand 7640’– 7670’, (60 holes) w/ 47,418 gal 18 # pHaserFrac Hybrid
cross linked gel containing 152,000# 20/40 Sand. 12-29-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7640 ft. | # Of Holes: | 60 | | Interval Bottom: | 7670 ft. | Hole Size: | 0.42 in. |
|
Formation JNBRR Formation Classification: Status: CM - 4/20/2012 Interval Top: 7000 ft. Interval Bottom: 7670 ft.| Completed Information for Formation J-NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/20/2012 | | Treatment Summary: | Set CBP @ 6970'. 04-14-12
Drilled out CBP @ 6970', CFP @ 7150' to commingle the JSND-NBRR. 04-15-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7615 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/20/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 28 | | BBLS_OIL | 15 | | BTU_GAS | 1296 | | CALC_BBLS_H2O | 28 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 22133 | | CALC_MCF_GAS | 332 | | CASING_PRESS | 848 | | GRAVITY_OIL | 59 | | MCF_GAS | 332 | | TUBING_PRESS | 309 |
| | Perforation Data: | | Interval Top: | 7000 ft. | # Of Holes: | 192 | | Interval Bottom: | 7670 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: AB - 11/27/2023 Interval Top: 7000 ft. Interval Bottom: 7084 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/3/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/23/2011 | | Treatment Summary: | Set CFP @ 7150'. 12-29-11
Frac'd the Niobrara 7000’ – 7084’ (132 holes), w/ 100,758 gals 18 # pHaserFrac
Hybrid cross linked gel containing 247,840# 30/50 sand. 12-29-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7000 ft. | # Of Holes: | 132 | | Interval Bottom: | 7084 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/27/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|