Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33023
Well Classification: OW Status: SI - 2/1/2021
Well Name/No:Rohn PC LD #16-96HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:9059.6
Facility Status:SIStatus Date2/1/2021
FacilityID:421701LocationID:421702
County:WELD #123Location:SWSW 9 9N58W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4787 ft.
Planned Location:250FSL  250 FWLLat/Long: 40.759270 / -103.877940Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.759280 / -103.877940Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/29/2011
End Date: 8/29/2011
Reported: 6/4/2012
Prior to rule 205A.b.(2)(A)
Days to report: 280
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 2/1/2021             Measured TD: 10140 ft.    Vertical TD: 5759 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 2/1/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/26/2013
Prop Depth/Form:12015 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 6 in., Size: 15 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 6, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 196, Top: , Bottom: 600 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6357 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 513, Top: , Bottom: 6357 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 4496 ft., Depth: 12015 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom: 12015 ft.

Wellbore Completed
Completion Date:7/7/2011
Spud Date:6/29/2011Spud Date Is:ACTUAL
Measured TD:10140 ft.Measured PB depth:10115 ft.
True Vertical TD:5759 ft.True Vertical PB depth:5734 ft.
Top PZ Location:Sec:16 Twp: 9N 58WFootage: 1151 FNL  683 FWLDepth
Bottom Hole Location:Sec:16 Twp: 9N 58WFootage: 639 FNL  712 FELDepth
Log Types:CBL/GRL/CL.
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 124 ft., Weight: 84 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 124 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 24 ft., Depth: 671 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 671 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 24 ft., Depth: 6308 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 1000 ft., Bottom: 6308 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5161 ft., Depth: 10125 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3318 ft.
NIOBRARA5954 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 2/1/2021                  Interval Top: 6472 ft.    Interval Bottom: 10058 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/23/2011Choke Size:0.000 in.
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/29/2011
Treatment Summary:Frac'd the Niobrara w/ 2077741 gals of Silverstim and Slick Water with 3,352,700.1#'s of Ottawa sand.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/21/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 99
BBLS_OIL 627
BTU_GAS 1507
CALC_BBLS_H2O 99
CALC_BBLS_OIL 627
CALC_GOR 1232
CALC_MCF_GAS 773
CASING_PRESS 720
GRAVITY_OIL 35
MCF_GAS 773
TUBING_PRESS 250
Perforation Data:
Interval Top:6472 ft.# Of Holes:0
Interval Bottom:10058 ft.Hole Size:0 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedYCut and Cap Date
08/13/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
01/31/2021
Low ProducingYProduction Period
08/2023 - 07/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No