|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2021 Measured TD: 7494 ft. Vertical TD: 7425 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/26/2013 | | Proposed Top PZ Location: | Sec:8 Twp: 2N 65W | Footage: 675 FSL 540 FEL | | Bottom Hole Location: | Sec:8 Twp: 2N 65W | Footage: 675 FSL 540 FEL | | Proposed Depth/Form: | 7516 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2SE4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: S2SE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: , Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7516 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7516 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/17/2011 | | Spud Date: | 7/14/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7494 ft. | Measured PB depth: | 7461 ft. | | True Vertical TD: | 7425 ft. | True Vertical PB depth: | 7392 ft. | | Top PZ Location: | Sec:8 Twp: 2N 65W | Footage: 708 FSL 534 FEL | | Bottom Hole Location: | Sec:8 Twp: 2N 65W | Footage: 714 FSL 526 FEL | | Log Types: | CD-CN-ML, HRI; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 838 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 0 ft., Bottom: 838 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7484 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 946, Top: 406 ft., Bottom: 7484 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4028 ft. | | | | | SUSSEX | 4389 ft. | 4672 ft. | | | | NIOBRARA | 7113 ft. | | | | | FORT HAYS | 7300 ft. | | | | | CODELL | 7324 ft. | | | |
Formation NB-CD Formation Classification: OW Status: SI - 7/1/2021 Interval Top: 7158 ft. Interval Bottom: 7340 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/8/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/25/2011 | | Treatment Summary: | NB PERF 7158-7228 TOTAL 62 SIZE 0.42 CD PERF 7324-7340 TOTAL 64 SIZE 0.38
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 243,348 gal Slickwater w/ 200,780# 40/70, 4,000# SuperLC
Frac Codell down 4-1/2" Csg w/ 205,338 gal Slickwater w/ 151,100# 40/70, 4,000# SuperLC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/8/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 127 | | BTU_GAS | 1208 | | CALC_BBLS_OIL | 127 | | CALC_GOR | 1638 | | CALC_MCF_GAS | 208 | | CASING_PRESS | 1362 | | GRAVITY_OIL | 51 | | MCF_GAS | 208 |
| | Perforation Data: | | Interval Top: | 7158 ft. | # Of Holes: | 126 | | Interval Bottom: | 7340 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 06/30/2021 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|