|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 8/1/2020 Measured TD: 8145 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 8/1/2020 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 2/26/2013 | | Proposed Depth/Form: | 8120 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SE/4 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 950 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 950 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8120 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 786, Top: , Bottom: 8120 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/8/2011 | | Spud Date: | 9/4/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8145 ft. | Measured PB depth: | 8065 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR/CCL, CBL/VDL, AC/TR/SD/DSN | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 994 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 387, Top: 0 ft., Bottom: 944 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8111 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 700, Top: 2150 ft., Bottom: 8111 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4041 ft. | | | | | SUSSEX | 4563 ft. | | | | | SHANNON | 5106 ft. | | | | | TEEPEE BUTTES | 6278 ft. | | | | | NIOBRARA | 6979 ft. | | | | | FORT HAYS | 7233 ft. | | | | | CODELL | 7253 ft. | | | | | MOWRY | 7703 ft. | | | | | J SAND | 7726 ft. | | | | | DAKOTA | 7910 ft. | | | |
Formation DKTA Formation Classification: OW Status: SI - 10/1/2019 Interval Top: 7902 ft. Interval Bottom: 7968 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | 10/25/2011 | Choke Size: | 12.000 in. | | Formation Name: | DAKOTA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/21/2011 | | Treatment Summary: | Frac'd Dakota w/ 36,330 gals of pHaserFrac and 58,700#'s of Ottawa sand.
Dakota is producing through flow through plug. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/28/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 130 | | BBLS_OIL | 76 | | BTU_GAS | 1204 | | CALC_BBLS_H2O | 130 | | CALC_BBLS_OIL | 76 | | CALC_GOR | 1145 | | CALC_MCF_GAS | 87 | | CASING_PRESS | 520 | | GRAVITY_OIL | 49 | | MCF_GAS | 87 |
| | Perforation Data: | | Interval Top: | 7902 ft. | # Of Holes: | 113 | | Interval Bottom: | 7968 ft. | Hole Size: | 0 in. |
|
Formation JSND Formation Classification: OW Status: SI - 8/1/2020 Interval Top: 7695 ft. Interval Bottom: 7734 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/25/2011 | Choke Size: | 12.000 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/21/2011 | | Treatment Summary: | Frac'd J-Sand w/ 147,126 gals of Silverstim with 281,000#'s of Ottawa sand.
J-Sand producing thorugh flow plug. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/28/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 130 | | BBLS_OIL | 76 | | BTU_GAS | 1204 | | CALC_BBLS_H2O | 130 | | CALC_BBLS_OIL | 76 | | CALC_GOR | 1145 | | CALC_MCF_GAS | 87 | | CASING_PRESS | 520 | | GRAVITY_OIL | 49 | | MCF_GAS | 87 |
| | Perforation Data: | | Interval Top: | 7695 ft. | # Of Holes: | 71 | | Interval Bottom: | 7734 ft. | Hole Size: | 0 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 10/1/2019 Interval Top: 7017 ft. Interval Bottom: 7263 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/25/2011 | Choke Size: | 12.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/21/2011 | | Treatment Summary: | Niobrara perfs 7017-7120. 50 shots.
Codell 7253-7263. 41 shots.
Frac'd codell/Niobrara w/ 270,900 gals of Slick water, Silverstim and 15% HCI with 517,000#'s of Sand.
Commingle Codell and Niobrara. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/28/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 130 | | BBLS_OIL | 76 | | BTU_GAS | 1204 | | CALC_BBLS_H2O | 130 | | CALC_BBLS_OIL | 76 | | CALC_GOR | 1145 | | CALC_MCF_GAS | 87 | | CASING_PRESS | 520 | | GRAVITY_OIL | 49 | | MCF_GAS | 87 |
| | Perforation Data: | | Interval Top: | 7017 ft. | # Of Holes: | 91 | | Interval Bottom: | 7263 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 07/31/2020 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|