|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2021 Measured TD: 7995 ft. Vertical TD: 7869 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/26/2013 | | Proposed Top PZ Location: | Sec:8 Twp: 2N 65W | Footage: 1270 FSL 50 FEL | | Bottom Hole Location: | Sec:8 Twp: 2N 65W | Footage: 1270 FSL 50 FEL | | Proposed Depth/Form: | 8032 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: , Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8032 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8032 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/14/2011 | | Spud Date: | 7/9/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7995 ft. | Measured PB depth: | 7962 ft. | | True Vertical TD: | 7869 ft. | True Vertical PB depth: | 7836 ft. | | Top PZ Location: | Sec:8 Twp: 2N 65W | Footage: 1303 FSL 46 FEL | | Bottom Hole Location: | Sec:8 Twp: 2N 65W | Footage: 1312 FSL 44 FEL | | Log Types: | CBL
OPEN HOLE LOGS BRIDGED OUT @ 1275', NO OPEN HOLE LOGS. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 861 ft., Weight: 24# , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 0 ft., Bottom: 861 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7985 ft., Weight: 11.6# , Citings Type: ACTUAL | | Cement: | Sacks: 231, Top: 6260 ft., Bottom: 7985 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 670 ft., Depth: 5620 ft., Bottom: 5650 ft., Sacks: 688, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3957 ft. | | | | | SUSSEX | 4346 ft. | | | | | NIOBRARA | 7144 ft. | | | | | FORT HAYS | 7403 ft. | | | | | CODELL | 7425 ft. | | | | | J SAND | 7840 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 7/1/2021 Interval Top: 7814 ft. Interval Bottom: 7858 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/8/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/18/2011 | | Treatment Summary: | J S PERF 7814-7858 TOTAL 64 SIZE 0.42
Frac J-Sand down 4-1/2" Csg w/ 144,900 gal Slickwater w/ 115,620# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7814 ft. | # Of Holes: | 64 | | Interval Bottom: | 7858 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 9/8/2011 Interval Top: 7166 ft. Interval Bottom: 7858 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 9/8/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/18/2011 | | Treatment Summary: | NB PERF 7166-7270 TOTAL 68 SIZE 0.42
CD PERF 7408-7424 TOTAL 64 SIZE 0.38
J S PERF 7814-7858 TOTAL 64 SIZE 0.42 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/8/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 95 | | BTU_GAS | 1208 | | CALC_BBLS_OIL | 95 | | CALC_GOR | 1648 | | CALC_MCF_GAS | 156 | | CASING_PRESS | 1647 | | GRAVITY_OIL | 51 | | MCF_GAS | 156 |
| | Perforation Data: | | Interval Top: | 7166 ft. | # Of Holes: | 196 | | Interval Bottom: | 7858 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 7/1/2021 Interval Top: 7166 ft. Interval Bottom: 7424 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/8/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/29/2011 | | Treatment Summary: | NB PERF 7166-7270 TOTAL 68 SIZE 0.42 CD PERF 7408-7424 TOTAL 64 SIZE 0.38
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 240,284 gal Slickwater w/ 200,800# 40/70, 4,000# SuperLC
Frac Codell down 4-1/2" Csg w/ 199,374 gal Slickwater w/ 150,680# 40/70, 4,000# SuperLC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7166 ft. | # Of Holes: | 132 | | Interval Bottom: | 7424 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 06/30/2021 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|