|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 9/13/2024 Measured TD: 7560 ft. Vertical TD: 7501 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 9/13/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/26/2013 | | Proposed Top PZ Location: | Sec:8 Twp: 2N 65W | Footage: 500 FSL 500 FWL | | Bottom Hole Location: | Sec:8 Twp: 2N 65W | Footage: 500 FSL 500 FWL | | Proposed Depth/Form: | 7526 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2SW | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: S2SW | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24# , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: , Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7526 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7526 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/9/2011 | | Spud Date: | 11/5/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7560 ft. | Measured PB depth: | 7521 ft. | | True Vertical TD: | 7501 ft. | True Vertical PB depth: | 7462 ft. | | Top PZ Location: | Sec:8 Twp: 2N 65W | Footage: 483 FSL 458 FWL | | Bottom Hole Location: | Sec:8 Twp: 2N 65W | Footage: 478 FSL 455 FWL | | Log Types: | PRE FORM 5 | | Log Types: | CBL
NO OPEN HOLE LOGS, BRIDGED OUT AT 991'. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 835 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 0 ft., Bottom: 835 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7538 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1035, Top: 0 ft., Bottom: 7538 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3800 ft. | 4015 ft. | | | | SUSSEX | 4200 ft. | 4398 ft. | | | | NIOBRARA | 7107 ft. | | | | | FORT HAYS | 7357 ft. | | | | | CODELL | 7380 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 4/4/2012 Interval Top: 7384 ft. Interval Bottom: 7398 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/30/2011 | | Treatment Summary: | CD PERF 7384-7398 HOLES 56 SIZE 0.38
Frac Codell down 4-1/2" Csg w/ 197,064 gal Slickwater w/ 152,500# 40/70, 4,000# SuperLC, 0# . Broke @ 3,526 psi @ 5.3 bpm. ATP=4,856 psi; MTP=5,068 psi; ATR=63.7 bpm; ISDP=3,500 psi |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7384 ft. | # Of Holes: | 56 | | Interval Bottom: | 7398 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/13/2024 Interval Top: 7154 ft. Interval Bottom: 7398 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/30/2011 | | Treatment Summary: | NB PERF 7154-7257 HOLES 64 SIZE 0.42 CD PERF 7384-7398 HOLES 56 SIZE 0.38 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/7/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 10 | | BTU_GAS | 1150 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 10000 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 53 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7154 ft. | # Of Holes: | 120 | | Interval Bottom: | 7398 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 4/4/2012 Interval Top: 7154 ft. Interval Bottom: 7257 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/6/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/30/2011 | | Treatment Summary: | NB PERF 7154-7257 HOLES 64 SIZE 0.42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 229,658 gal Slickwater w/ 204,760# 40/70, 4,000# SuperLC, 0# . Broke @ 3,403 psi @ 5.2 bpm. ATP=4,853 psi; MTP=5,066 psi; ATR=66.8 bpm; ISDP=3,255 psi |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7154 ft. | # Of Holes: | 64 | | Interval Bottom: | 7257 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/13/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|