|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 7/13/2018 Measured TD: 6705 ft. Vertical TD: 6704 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 7/13/2018 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 2/16/2013 | | Proposed Top PZ Location: | Sec:4 Twp: 4N 63W | Footage: 515 FNL 463 FEL | | Bottom Hole Location: | Sec:4 Twp: 4N 63W | Footage: 515 FNL 463 FEL | | Proposed Depth/Form: | 6750 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 40, Drill Unit: NE/4 NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 697 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 697 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6750 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 6000 ft., Bottom: 6750 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/10/2011 | | Spud Date: | 7/6/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 6705 ft. | Measured PB depth: | 6676 ft. | | True Vertical TD: | 6704 ft. | True Vertical PB depth: | 6675 ft. | | Top PZ Location: | Sec:4 Twp: 4N 63W | Footage: 515 FNL 463 FEL | | Bottom Hole Location: | Sec:4 Twp: 4N 63W | Footage: 515 FNL 463 FEL | | Log Types: | CBL, GR, CD, CN, Dl | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 0 ft., Bottom: 750 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6698 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 2870 ft., Bottom: 6698 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3236 ft. | | | | | SUSSEX | 3937 ft. | | | | | NIOBRARA | 6235 ft. | | | | | FORT HAYS | 6466 ft. | | | | | CODELL | 6489 ft. | | | |
Formation NB-CD Formation Classification: GW Status: AB - 7/13/2018 Interval Top: 6238 ft. Interval Bottom: 6502 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/30/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/1/2011 | | Treatment Summary: | CODELL PUMPED 32,550 GAL PAD FLUID. PUMPED 102,606 GAL PHASERFRAC W/245,480 LBS 20/40 SAND. ISDP 3302 PSI, ATP 3850 PSI, ATR 22.2 BPM. NIOBRARA PUMPED 19,614 GAL PAD FLUID AND 115,962 GAL PHASER FRAC W/260,480 LBS. 30/50 SAND. ISDP 3385 PSI; ATP 4049 PSI, ATR 49.3 BPM. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/30/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 114 | | CALC_BBLS_OIL | 114 | | CASING_PRESS | 1650 | | GRAVITY_OIL | 40 |
| | Perforation Data: | | Interval Top: | 6238 ft. | # Of Holes: | 96 | | Interval Bottom: | 6502 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/13/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|