|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2025 Measured TD: 8744 ft. Vertical TD: 8626 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/16/2013 | | Proposed Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 2003 FSL 680 FWL | | Bottom Hole Location: | Sec:29 Twp: 1N 68W | Footage: 2003 FSL 680 FWL | | Proposed Depth/Form: | 8160 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8160 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 8160 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/28/2011 | | Spud Date: | 3/20/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8744 ft. | Measured PB depth: | 8631 ft. | | True Vertical TD: | 8626 ft. | True Vertical PB depth: | 8513 ft. | | Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 2003 FSL 680 FWL | | Bottom Hole Location: | Sec:29 Twp: 1N 68W | Footage: 2003 FSL 680 FWL | | Log Types: | Compensated Density Compensated Neutron High Resolution Induction
Gamma Ray C.C.L. Cement Bond V.D.L. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 928 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 0 ft., Bottom: 928 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8691 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 720, Top: 4506 ft., Bottom: 8691 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4420 ft. | | | | | SUSSEX | 4804 ft. | | | | | NIOBRARA | 7669 ft. | | | | | CODELL | 7985 ft. | | | | | J SAND | 8530 ft. | | | | | DAKOTA | 8702 ft. | | | |
Formation JSND Formation Classification: OW Status: PR - 7/1/2025 Interval Top: 8542 ft. Interval Bottom: 8552 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/7/2011 | | Treatment Summary: | PERFS 8542 - 8552 HOLES 40 SIZE .41 FRAC THE J SAND FORMATION WITH 5352 BBL OF STEM OIL AND 91,492 LBS OF 30-50 OTTAWA SAND. THE FORMATION BROKE AT 2691 PSI, AND TREATED AT 64.4 BPM, ATP 4275 PSI |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8542 ft. | # Of Holes: | 40 | | Interval Bottom: | 8552 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: OW Status: PR - 7/1/2025 Interval Top: 8040 ft. Interval Bottom: 8051 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/10/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/6/2011 | | Treatment Summary: | PERFS 8040-8051 HOLES 44 SIZE .42 FRAC THE CODELL W/212,666 FRESH WATER AND 195,224 LBS OF 30-50 WHITE SAND FORMATION BROKE @ 3720 PSI INJ RATE 4.7 BBL/MIN |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8530 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/15/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 47 | | BTU_GAS | 1125 | | CALC_BBLS_OIL | 47 | | CALC_GOR | 723 | | CALC_MCF_GAS | 34 | | CASING_PRESS | 1850 | | GRAVITY_OIL | 51 | | MCF_GAS | 34 | | TUBING_PRESS | 1200 |
| | Perforation Data: | | Interval Top: | 8040 ft. | # Of Holes: | 44 | | Interval Bottom: | 8051 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 28 |
| Total Gas Produced (MCF) | 56 |
| GOR | 2000 |
| GOR Determination | BOE |
| Average BOE per Day | 0.099 |
| Average MCFE per Day | 0.602 |
| Federal Financial Assurance | i | |
|
|