|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 7/2/2024 Measured TD: 8212 ft. Vertical TD: 7979 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 7/2/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/16/2013 | | Proposed Top PZ Location: | Sec:12 Twp: 2N 65W | Footage: 1320 FNL 1320 FEL | | Bottom Hole Location: | Sec:12 Twp: 2N 65W | Footage: 1320 FNL 1320 FEL | | Proposed Depth/Form: | 8222 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8222 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8222 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/31/2011 | | Spud Date: | 10/24/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8212 ft. | Measured PB depth: | 8184 ft. | | True Vertical TD: | 7979 ft. | True Vertical PB depth: | 7951 ft. | | Top PZ Location: | Sec:12 Twp: 2N 65W | Footage: 1259 FNL 1296 FEL | | Bottom Hole Location: | Sec:12 Twp: 2N 65W | Footage: 1268 FNL 1239 FEL | | Log Types: | CD-CN-ML, HRI; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 0 ft., Bottom: 800 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8222 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 87, Top: 7739 ft., Bottom: 8222 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7739 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 995, Top: 856 ft., Bottom: 7739 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4048 ft. | 4250 ft. | | | | SUSSEX | 4454 ft. | 4870 ft. | | | | NIOBRARA | 7149 ft. | | | | | FORT HAYS | 7340 ft. | | | | | CODELL | 7365 ft. | | | | | J SAND | 7824 ft. | | | | | DAKOTA | 8035 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 7/2/2024 Interval Top: 7845 ft. Interval Bottom: 7868 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/27/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/30/2011 | | Treatment Summary: | J S PERF 7845-7868 HOLES 51 SIZE 0.38
Frac J-Sand down 4-1/2" Csg w/ 133,728 gal Slickwater w/ 115,080# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7845 ft. | # Of Holes: | 51 | | Interval Bottom: | 7868 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: Status: CM - 12/27/2011 Interval Top: 7196 ft. Interval Bottom: 7868 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 12/27/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/30/2011 | | Treatment Summary: | NB PERF 7196-7258 HOLES 58 SIZE 0.42
CD PERF 7370-7380 HOLES 60 SIZE 0.42
J S PERF 7845-7868 HOLES 51 SIZE 0.38 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/27/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 100 | | BTU_GAS | 1287 | | CALC_BBLS_OIL | 100 | | CALC_GOR | 1000 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 1800 | | GRAVITY_OIL | 49 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 7196 ft. | # Of Holes: | 169 | | Interval Bottom: | 7868 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/2/2024 Interval Top: 7196 ft. Interval Bottom: 7380 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/27/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/30/2011 | | Treatment Summary: | NB PERF 7196-7258 HOLES 58 SIZE 0.42 CD PERF 7370-7380 HOLES 60 SIZE 0.42
Frac Niobrara B down 4-1/2" Csg w/ 250 gal 15% HCl & 248,012 gal Slickwater w/ 201,360# 40/70, 4000# 20/40
Frac Codell down 4-1/2" Csg w/ 168,378 gal Slickwater w/ 115,920# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7196 ft. | # Of Holes: | 118 | | Interval Bottom: | 7380 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/02/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|