|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 6/23/2020 Measured TD: 7535 ft. Vertical TD: 7440 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 6/23/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 2/15/2013 | Proposed Top PZ Location: | Sec:20 Twp: 4N 67W | Footage: 2572 FSL 1220 FWL | Bottom Hole Location: | Sec:20 Twp: 4N 67W | Footage: 2572 FSL 1220 FWL | Proposed Depth/Form: | 7560 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 490 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 250, Top: 0 ft., Bottom: 490 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7560 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 160, Top: 6860 ft., Bottom: 7560 ft. |
| | |
Wellbore Completed | Completion Date: | 1/18/2012 | Spud Date: | 1/14/2012 | Spud Date Is: | ACTUAL | Measured TD: | 7535 ft. | Measured PB depth: | 7434 ft. | True Vertical TD: | 7440 ft. | True Vertical PB depth: | 7380 ft. | Top PZ Location: | Sec:20 Twp: 4N 67W | Footage: 2572 FSL 1220 FWL | Bottom Hole Location: | Sec:20 Twp: 4N 67W | Footage: 2572 FSL 1220 FWL | Log Types: | Triple Combo
High Resolution Induction
Compensated Density/Neutron Gamma Ray | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 530 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 370, Top: 0 ft., Bottom: 530 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7502 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 580, Top: 2310 ft., Bottom: 7502 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | GREELEY SAND | 2420 ft. | | | | PARKMAN | 3670 ft. | | | | SUSSEX | 4234 ft. | | | | SHANNON | 4688 ft. | | | | TEEPEE BUTTES | 6195 ft. | | | | NIOBRARA | 7058 ft. | | | | FORT HAYS | 7328 ft. | | | | CODELL | 7350 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 8/21/2013 Interval Top: 7350 ft. Interval Bottom: 7370 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/18/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/18/2012 | Treatment Summary: | Codell Frac Treatment
Codell Treatment Totals: Cln Fluid: 4139.0 bbls, Sand Laden Fluid: 2638.8 bbls, Proppant: 115,680 lbs 30/50, ATP: 4738 psi, ATR: 60.5 bpm, MTP: 5374 psi, MTR: 60.7 bpm. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7350 ft. | # Of Holes: | 38 | Interval Bottom: | 7370 ft. | Hole Size: | 0.35 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/23/2020 Interval Top: 7061 ft. Interval Bottom: 7370 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/8/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 58 | BBLS_OIL | 400 | BTU_GAS | 1357 | CALC_BBLS_H2O | 6 | CALC_BBLS_OIL | 400 | CALC_GOR | 515 | CALC_MCF_GAS | 206 | CASING_PRESS | 1900 | GRAVITY_OIL | 47 | MCF_GAS | 206 | TUBING_PRESS | 1300 |
| Perforation Data: | Interval Top: | 7061 ft. | # Of Holes: | 57 | Interval Bottom: | 7370 ft. | Hole Size: | 0.35 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/21/2013 Interval Top: 7061 ft. Interval Bottom: 7230 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/18/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/4/2012 | Treatment Summary: | Niobrara Frac Treatment
Niobrara Treatment Totals: Cln Fluid: 5946.2 bbls, Sand Laden Fluid: 4343.9 bbls, Proppant: 199,1400 lbs 40/50, 4000 20/40 SLC ATP: 4473 psi, ATR: 59.7 bpm, MTP: 5525 psi, MTR: 60.2 bpm. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7061 ft. | # Of Holes: | 19 | Interval Bottom: | 7230 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
Reported Plugged | Y | 06/23/2020 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|