|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 1/10/2025 Measured TD: 7835 ft. Vertical TD: 7768 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 1/10/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/12/2015 | | Proposed Top PZ Location: | Sec:28 Twp: 2N 68W | Footage: 2585 FNL 1302 FWL | | Bottom Hole Location: | Sec:28 Twp: 2N 68W | Footage: 2575 FNL 1319 FWL | | Proposed Depth/Form: | 8189 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 3/22/2013 | | Spud Date: | 3/17/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 7835 ft. | Measured PB depth: | 7780 ft. | | True Vertical TD: | 7768 ft. | True Vertical PB depth: | 7713 ft. | | Top PZ Location: | Sec:28 Twp: 2N 68W | Footage: 2585 FNL 1302 FWL | | Bottom Hole Location: | Sec:28 Twp: 2N 68W | Footage: 2575 FNL 1319 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 848 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 340, Top: 0 ft., Bottom: 848 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 4910 ft., Depth: 7824 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 4910 ft., Bottom: 7824 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4422 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 125, Top: 3810 ft., Bottom: 4412 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4364 ft. | | | | | SHANNON | 4929 ft. | | | | | SHARON SPRINGS | 7304 ft. | | | | | NIOBRARA | 7417 ft. | | | | | FORT HAYS | 7650 ft. | | | | | CODELL | 7670 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 10/7/2013 Interval Top: 7671 ft. Interval Bottom: 7690 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/21/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/21/2013 | Treatment End Date: | 4/24/2013 | | Treatment Summary: | Mesa Wireline perforated Codell 7671-7690 w/3 jspf - 57 holes. 4-21-2013
Frac Codell with 110,770# 40/70 with 3154 bbls SLF. 4-24-2013 | | Total fluid used in treatment (bbls): | 3154 | Max pressure during treatment (psi): | 6250 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.90 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 670 | | Fresh water used in treatment (bbls): | 3154 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 110770 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7671 ft. | # Of Holes: | 57 | | Interval Bottom: | 7690 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 1/10/2025 Interval Top: 7492 ft. Interval Bottom: 7690 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/21/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/21/2013 | Treatment End Date: | 4/25/2013 | | Treatment Summary: | Drill up kill plug @ 7400'. Continue in hole to next CFP @ 7607'. Drill up plug and continue past Codell Perfs @ 7671'. 5-6-2013
Mesa Wireline perforated Codell 7671-7690 w/3 jspf - 57 holes. 4-21-2013
Frac Codell with 110,770# 40/70 with 3154 bbls SLF. 4-24-2013
Set CFP @ 7550, perforate Niobrara. 4-24-2013
Frac Niobrara with 112,500 # 40/70 with 3126 bbls SLF. 4-25-2013 | | Total fluid used in treatment (bbls): | 6280 | Max pressure during treatment (psi): | 6250 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.90 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 670 | | Fresh water used in treatment (bbls): | 6280 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 216910 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7634 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/1/2013 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 28 | | BBLS_OIL | 98 | | BTU_GAS | 1148 | | CALC_BBLS_H2O | 28 | | CALC_BBLS_OIL | 98 | | CALC_GOR | 3255 | | CALC_MCF_GAS | 319 | | CASING_PRESS | 1265 | | GRAVITY_OIL | 51 | | MCF_GAS | 319 | | TUBING_PRESS | 490 |
| | Perforation Data: | | Interval Top: | 7492 ft. | # Of Holes: | 113 | | Interval Bottom: | 7690 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 10/7/2013 Interval Top: 7492 ft. Interval Bottom: 7506 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/21/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/24/2013 | Treatment End Date: | 4/25/2013 | | Treatment Summary: | Set CFP @ 7550, perforate Niobrara. 4-24-2013
Frac Niobrara with 112,500 # 40/70 with 3126 SLF. 4-25-2013 | | Total fluid used in treatment (bbls): | 3126 | Max pressure during treatment (psi): | 5460 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.91 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 670 | | Fresh water used in treatment (bbls): | 3126 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 112500 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7492 ft. | # Of Holes: | 56 | | Interval Bottom: | 7506 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/10/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 162 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.075 |
| Average MCFE per Day | 0.435 |
| Federal Financial Assurance | i | |
|
|