Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32896
Well Classification: OW Status: PA - 1/10/2025
Well Name/No:RASMUSSEN #2-4-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/10/2025
FacilityID:421338LocationID:333145
County:WELD #123Location:SENW 28 2N68W 6
Field:WATTENBERG - #90750Elevation:4935 ft.
Planned Location:1962FNL  1780 FWLLat/Long: 40.111500 / -105.011350Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.111504 / -105.011341Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/24/2013
End Date: 4/25/2013
Reported: 6/27/2013
Days to report: 63
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 1/10/2025             Measured TD: 7835 ft.    Vertical TD: 7768 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 1/10/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/12/2015
Proposed Top PZ Location:Sec:28 Twp: 2N 68W Footage: 2585 FNL  1302 FWL
Bottom Hole Location:Sec:28 Twp: 2N 68W Footage: 2575 FNL  1319 FWL
Proposed Depth/Form:8189 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:3/22/2013
Spud Date:3/17/2013Spud Date Is:ACTUAL
Measured TD:7835 ft.Measured PB depth:7780 ft.
True Vertical TD:7768 ft.True Vertical PB depth:7713 ft.
Top PZ Location:Sec:28 Twp: 2N 68WFootage: 2585 FNL  1302 FWL
Bottom Hole Location:Sec:28 Twp: 2N 68WFootage: 2575 FNL  1319 FWL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 848 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 0 ft., Bottom: 848 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 4910 ft., Depth: 7824 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 4910 ft., Bottom: 7824 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4422 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 3810 ft., Bottom: 4412 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4364 ft.
SHANNON4929 ft.
SHARON SPRINGS7304 ft.
NIOBRARA7417 ft.
FORT HAYS7650 ft.
CODELL7670 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/7/2013                 Interval Top: 7671 ft.    Interval Bottom: 7690 ft.

 Completed Information for Formation CODELL
1st Production Date:6/21/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/21/2013Treatment End Date:4/24/2013
Treatment Summary:Mesa Wireline perforated Codell 7671-7690 w/3 jspf - 57 holes. 4-21-2013 Frac Codell with 110,770# 40/70 with 3154 bbls SLF. 4-24-2013
Total fluid used in treatment (bbls):3154Max pressure during treatment (psi):6250
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):670
Fresh water used in treatment (bbls):3154Disposition method For flowback:DISPOSAL
Total proppant used (lbs):110770Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7671 ft.# Of Holes:57
Interval Bottom:7690 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 1/10/2025                 Interval Top: 7492 ft.    Interval Bottom: 7690 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/21/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/21/2013Treatment End Date:4/25/2013
Treatment Summary:Drill up kill plug @ 7400'. Continue in hole to next CFP @ 7607'. Drill up plug and continue past Codell Perfs @ 7671'. 5-6-2013 Mesa Wireline perforated Codell 7671-7690 w/3 jspf - 57 holes. 4-21-2013 Frac Codell with 110,770# 40/70 with 3154 bbls SLF. 4-24-2013 Set CFP @ 7550, perforate Niobrara. 4-24-2013 Frac Niobrara with 112,500 # 40/70 with 3126 bbls SLF. 4-25-2013
Total fluid used in treatment (bbls):6280Max pressure during treatment (psi):6250
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.90
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):670
Fresh water used in treatment (bbls):6280Disposition method For flowback:DISPOSAL
Total proppant used (lbs):216910Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7634 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/1/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 28
BBLS_OIL 98
BTU_GAS 1148
CALC_BBLS_H2O 28
CALC_BBLS_OIL 98
CALC_GOR 3255
CALC_MCF_GAS 319
CASING_PRESS 1265
GRAVITY_OIL 51
MCF_GAS 319
TUBING_PRESS 490
Perforation Data:
Interval Top:7492 ft.# Of Holes:113
Interval Bottom:7690 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/7/2013                 Interval Top: 7492 ft.    Interval Bottom: 7506 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/21/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/24/2013Treatment End Date:4/25/2013
Treatment Summary:Set CFP @ 7550, perforate Niobrara. 4-24-2013 Frac Niobrara with 112,500 # 40/70 with 3126 SLF. 4-25-2013
Total fluid used in treatment (bbls):3126Max pressure during treatment (psi):5460
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.91
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):670
Fresh water used in treatment (bbls):3126Disposition method For flowback:DISPOSAL
Total proppant used (lbs):112500Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7492 ft.# Of Holes:56
Interval Bottom:7506 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/10/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)162
GOR
GOR DeterminationMCFE
Average BOE per Day0.075
Average MCFE per Day0.435

 Federal Financial Assurance  i 

 Tribal Well  i No