Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32895
Well Classification: OW Status: PA - 1/10/2025
Well Name/No:RASMUSSEN #4-0-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/10/2025
FacilityID:421337LocationID:333145
County:WELD #123Location:SENW 28 2N68W 6
Field:WATTENBERG - #90750Elevation:4935 ft.
Planned Location:1962FNL  1810 FWLLat/Long: 40.111500 / -105.011240Lat/Long Source: Field Measured
As Drilled Location:50 FNL  2609 FWLLat/Long: 40.111506 / -105.011224Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/23/2013
End Date: 4/24/2013
Reported: 6/27/2013
Days to report: 64
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 1/10/2025             Measured TD: 8578 ft.    Vertical TD: 8148 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 1/10/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/12/2015
Proposed Top PZ Location:Sec:28 Twp: 2N 68W Footage: 23 FNL  2615 FWL
Bottom Hole Location:Sec:28 Twp: 2N 68W Footage: 50 FNL  2609 FWL
Proposed Depth/Form:8505 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8505 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 7444 ft., Bottom: 8505 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5116 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 150, Top: 4126 ft., Bottom: 5116 ft.

Wellbore Completed
Completion Date:3/10/2013
Spud Date:3/6/2013Spud Date Is:ACTUAL
Measured TD:8578 ft.Measured PB depth:8538 ft.
True Vertical TD:8148 ft.True Vertical PB depth:8108 ft.
Top PZ Location:Sec:28 Twp: 2N 68WFootage: 23 FNL  2615 FWL
Bottom Hole Location:Sec:28 Twp: 2N 68WFootage: 50 FNL  2609 FWL
Log Types:CBL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 812 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 822 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8561 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 4160 ft., Bottom: 8578 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4700 ft.
SHANNON5283 ft.
SHARON SPRINGS7614 ft.
NIOBRARA7712 ft.
FORT HAYS7977 ft.
CODELL7999 ft.
J SAND8430 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 1/10/2025                 Interval Top: 8434 ft.    Interval Bottom: 8463 ft.

 Completed Information for Formation J SAND
1st Production Date:6/20/2013Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/21/2013Treatment End Date:4/25/2013
Treatment Summary:Mesa Wireline perforated J Sand 8434' - 8439' & 8443' - 8463' w/ 3 jspf - total of 75 holes. Frac J Sand with 111,250# 20/40 with 114,450 gals SLF.
Total fluid used in treatment (bbls):10445Max pressure during treatment (psi):3260
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):504Min frac gradient (psi/ft):0.72
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):750
Fresh water used in treatment (bbls):9941Disposition method For flowback:DISPOSAL
Total proppant used (lbs):337641Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8434 ft.# Of Holes:75
Interval Bottom:8463 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/4/2014                  Interval Top: 8000 ft.    Interval Bottom: 8020 ft.

 Completed Information for Formation CODELL
1st Production Date:6/20/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/23/2013Treatment End Date:4/23/2013
Treatment Summary:Set CFP @8060'. 04-23-2013 Frac Codell with 108,300# 40/70 with 113,106 gallons SLF. 04-23-2013
Total fluid used in treatment (bbls):3129Max pressure during treatment (psi):6137
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):2693Total flowback volume recovered (bbls):750
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):108300Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8000 ft.# Of Holes:60
Interval Bottom:8020 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 6/15/2015                 Interval Top: 7779 ft.    Interval Bottom: 8463 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:6/20/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/25/2013Treatment End Date:N/A
Treatment Summary:Continue in hold to next CFP @ 7830' and 8060'. Drill up plug and continue to top J-sand Perfs @ 8434'. 04-05-2013
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:4/21/2013Treatment End Date:4/25/2013
Treatment Summary:Continue in hold to next CFP @ 7830' and 8060'. Drill up plug and continue to top J Sand perf at 8434'. 04-05-13
Total fluid used in treatment (bbls):10445Max pressure during treatment (psi):6173
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):504Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1500
Fresh water used in treatment (bbls):9941Disposition method For flowback:DISPOSAL
Total proppant used (lbs):337641Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8426 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/25/2013Test Method:flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 58
BBLS_OIL 57
BTU_GAS 1148
CALC_BBLS_H2O 58
CALC_BBLS_OIL 57
CALC_GOR 4140
CALC_MCF_GAS 236
CASING_PRESS 1186
GRAVITY_OIL 51
MCF_GAS 236
TUBING_PRESS 342
Perforation Data:
Interval Top:7779 ft.# Of Holes:191
Interval Bottom:8463 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 1/10/2025                 Interval Top: 7779 ft.    Interval Bottom: 8020 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/20/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/21/2013Treatment End Date:4/25/2013
Treatment Summary:Set CFP @8060'. 04-23-2013 Frac Codell with 108,300# 40/70 with 113,106 gallons SLF. 04-23-2013 Set CFP @ 7830', Perforate Niobrara. 04.23.2013 Frac Niobrara B with 111,700# 40/70 with 113,820 gals SLF. 04.24.2013
Total fluid used in treatment (bbls):6660Max pressure during treatment (psi):6173
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):5403Total flowback volume recovered (bbls):1500
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):220000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7779 ft.# Of Holes:116
Interval Bottom:8020 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/4/2014                  Interval Top: 7779 ft.    Interval Bottom: 7793 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/20/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/23/2013Treatment End Date:4/24/2013
Treatment Summary:Set CFP @ 7830', Perforate Niobrara. 04.23.2013 Frac Niobrara B with 111,700# 40/70 with 113,820 gals SLF. 04.24.2013
Total fluid used in treatment (bbls):3531Max pressure during treatment (psi):5450
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):2710Total flowback volume recovered (bbls):750
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):111700Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7779 ft.# Of Holes:56
Interval Bottom:7793 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/10/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)300
GOR
GOR DeterminationMCFE
Average BOE per Day0.140
Average MCFE per Day0.806

 Federal Financial Assurance  i 

 Tribal Well  i No