Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32895
Well Classification: OW Status: PA - 1/10/2025
Well Name/No:RASMUSSEN #4-0-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/10/2025
FacilityID:421337LocationID:333145
County:WELD #123Location:SENW 28 2N68W 6
Field:WATTENBERG - #90750Elevation:4935 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1962FNL  1810 FWLLat/Long: 40.111500 / -105.011240Lat/Long Source: Field Measured
As Drilled Location:50 FNL  2609 FWLLat/Long: 40.111506 / -105.011224Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/23/2013
End Date: 4/24/2013
Reported: 6/27/2013
Days to report: 64
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 1/10/2025             Measured TD: 8578 ft.    Vertical TD: 8148 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 1/10/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/12/2015
Proposed Top PZ Location:Sec:28 Twp: 2N 68W Footage: 23 FNL  2615 FWL
Bottom Hole Location:Sec:28 Twp: 2N 68W Footage: 50 FNL  2609 FWL
Proposed Depth/Form:8505 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8505 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 280, Top: 7444 ft., Bottom: 8505 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5116 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 150, Top: 4126 ft., Bottom: 5116 ft.

Wellbore Completed
Completion Date:3/10/2013
Spud Date:3/6/2013Spud Date Is:ACTUAL
Measured TD:8578 ft.Measured PB depth:8538 ft.
True Vertical TD:8148 ft.True Vertical PB depth:8108 ft.
Top PZ Location:Sec:28 Twp: 2N 68WFootage: 23 FNL  2615 FWL
Bottom Hole Location:Sec:28 Twp: 2N 68WFootage: 50 FNL  2609 FWL
Log Types:CBL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 812 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 822 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8561 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 4160 ft., Bottom: 8578 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4700 ft.
SHANNON5283 ft.
SHARON SPRINGS7614 ft.
NIOBRARA7712 ft.
FORT HAYS7977 ft.
CODELL7999 ft.
J SAND8430 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 1/10/2025                 Interval Top: 8434 ft.    Interval Bottom: 8463 ft.

 Completed Information for Formation J SAND
1st Production Date:6/20/2013Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/21/2013Treatment End Date:4/25/2013
Treatment Summary:Mesa Wireline perforated J Sand 8434' - 8439' & 8443' - 8463' w/ 3 jspf - total of 75 holes. Frac J Sand with 111,250# 20/40 with 114,450 gals SLF.
Total fluid used in treatment (bbls):10445Max pressure during treatment (psi):3260
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):504Min frac gradient (psi/ft):0.72
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):750
Fresh water used in treatment (bbls):9941Disposition method For flowback:DISPOSAL
Total proppant used (lbs):337641Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8434 ft.# Of Holes:75
Interval Bottom:8463 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/4/2014                  Interval Top: 8000 ft.    Interval Bottom: 8020 ft.

 Completed Information for Formation CODELL
1st Production Date:6/20/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/23/2013Treatment End Date:4/23/2013
Treatment Summary:Set CFP @8060'. 04-23-2013 Frac Codell with 108,300# 40/70 with 113,106 gallons SLF. 04-23-2013
Total fluid used in treatment (bbls):3129Max pressure during treatment (psi):6137
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):2693Total flowback volume recovered (bbls):750
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):108300Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8000 ft.# Of Holes:60
Interval Bottom:8020 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 6/15/2015                 Interval Top: 7779 ft.    Interval Bottom: 8463 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:6/20/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/25/2013Treatment End Date:N/A
Treatment Summary:Continue in hold to next CFP @ 7830' and 8060'. Drill up plug and continue to top J-sand Perfs @ 8434'. 04-05-2013
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:4/21/2013Treatment End Date:4/25/2013
Treatment Summary:Continue in hold to next CFP @ 7830' and 8060'. Drill up plug and continue to top J Sand perf at 8434'. 04-05-13
Total fluid used in treatment (bbls):10445Max pressure during treatment (psi):6173
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):504Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1500
Fresh water used in treatment (bbls):9941Disposition method For flowback:DISPOSAL
Total proppant used (lbs):337641Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8426 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/25/2013Test Method:flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 58
BBLS_OIL 57
BTU_GAS 1148
CALC_BBLS_H2O 58
CALC_BBLS_OIL 57
CALC_GOR 4140
CALC_MCF_GAS 236
CASING_PRESS 1186
GRAVITY_OIL 51
MCF_GAS 236
TUBING_PRESS 342
Perforation Data:
Interval Top:7779 ft.# Of Holes:191
Interval Bottom:8463 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 1/10/2025                 Interval Top: 7779 ft.    Interval Bottom: 8020 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/20/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/21/2013Treatment End Date:4/25/2013
Treatment Summary:Set CFP @8060'. 04-23-2013 Frac Codell with 108,300# 40/70 with 113,106 gallons SLF. 04-23-2013 Set CFP @ 7830', Perforate Niobrara. 04.23.2013 Frac Niobrara B with 111,700# 40/70 with 113,820 gals SLF. 04.24.2013
Total fluid used in treatment (bbls):6660Max pressure during treatment (psi):6173
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):5403Total flowback volume recovered (bbls):1500
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):220000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7779 ft.# Of Holes:116
Interval Bottom:8020 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/4/2014                  Interval Top: 7779 ft.    Interval Bottom: 7793 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:6/20/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/23/2013Treatment End Date:4/24/2013
Treatment Summary:Set CFP @ 7830', Perforate Niobrara. 04.23.2013 Frac Niobrara B with 111,700# 40/70 with 113,820 gals SLF. 04.24.2013
Total fluid used in treatment (bbls):3531Max pressure during treatment (psi):5450
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):2710Total flowback volume recovered (bbls):750
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):111700Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7779 ft.# Of Holes:56
Interval Bottom:7793 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/10/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No