|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 1/10/2025 Measured TD: 8446 ft. Vertical TD: 8135 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 1/10/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/12/2015 | | Proposed Top PZ Location: | Sec:28 Twp: 2N 68W | Footage: 556 FNL 723 FWL | | Bottom Hole Location: | Sec:28 Twp: 2N 68W | Footage: 555 FNL 724 FWL | | Proposed Depth/Form: | 8406 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8406 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 260, Top: 7411 ft., Bottom: 8406 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5113 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 150, Top: 4107 ft., Bottom: 5113 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/28/2013 | | Spud Date: | 3/24/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 8446 ft. | Measured PB depth: | 8400 ft. | | True Vertical TD: | 8135 ft. | True Vertical PB depth: | 8073 ft. | | Top PZ Location: | Sec:28 Twp: 2N 68W | Footage: 556 FNL 723 FWL | | Bottom Hole Location: | Sec:28 Twp: 2N 68W | Footage: 555 FNL 724 FWL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 838 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 838 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8424 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 4098 ft., Bottom: 8446 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4568 ft. | | | | | NIOBRARA | 7554 ft. | | | | | CODELL | 7854 ft. | | | | | J SAND | 8286 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 1/10/2025 Interval Top: 8287 ft. Interval Bottom: 8317 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/21/2013 | Treatment End Date: | 4/26/2013 | | Treatment Summary: | Mesa Wireline perforated J Sand 8287-8290 & 8296-8317. 4-22-2013
Frac J Sand with 109,430# 40/70 with 115,154 gals SLF. 4-25-2013 | | Total fluid used in treatment (bbls): | 3145 | Max pressure during treatment (psi): | 3322 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.72 | | Recycled water used in treatment (bbls): | 2742 | Total flowback volume recovered (bbls): | 795 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 109430 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8287 ft. | # Of Holes: | 72 | | Interval Bottom: | 8317 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 12/16/2013 Interval Top: 7855 ft. Interval Bottom: 7875 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/25/2013 | Treatment End Date: | 4/25/2013 | | Treatment Summary: | Set CFP @ 7920', perforate Codell. 4-25-2013
Frac Codell with 119,620# 40/70 with 118,314 gals SLF. 4-25-2013 | | Total fluid used in treatment (bbls): | 3281 | Max pressure during treatment (psi): | 5860 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.83 | | Recycled water used in treatment (bbls): | 2817 | Total flowback volume recovered (bbls): | 795 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 119620 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7855 ft. | # Of Holes: | 60 | | Interval Bottom: | 7875 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 7/6/2013 Interval Top: 7628 ft. Interval Bottom: 8317 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 7/6/2013 | Treatment End Date: | N/A | | Treatment Summary: | Drill up Kill plug @ 7397'. Continue in hole to next CFP@ 7695' and 7920'. Drill up plugs and continue past J-Sand Perfs @ 8287' - 8317'. 5-8-13 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8261 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/6/2013 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 27 | | BBLS_OIL | 20 | | BTU_GAS | 1148 | | CALC_BBLS_H2O | 27 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 8650 | | CALC_MCF_GAS | 173 | | CASING_PRESS | 905 | | GRAVITY_OIL | 51 | | MCF_GAS | 173 | | TUBING_PRESS | 234 |
| | Perforation Data: | | Interval Top: | 7628 ft. | # Of Holes: | 208 | | Interval Bottom: | 8317 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 1/10/2025 Interval Top: 7628 ft. Interval Bottom: 7875 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7628 ft. | # Of Holes: | 136 | | Interval Bottom: | 7875 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 12/16/2013 Interval Top: 7628 ft. Interval Bottom: 7647 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/20/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/25/2013 | Treatment End Date: | 4/26/2013 | | Treatment Summary: | Set CFP @ 7695, perforate Niobrara. 4-25-2013
Frac Niobrara with 142,360# 40/70 with 110,124 SLF. 4-26-2013 | | Total fluid used in treatment (bbls): | 2993 | Max pressure during treatment (psi): | 4600 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.87 | | Recycled water used in treatment (bbls): | 2622 | Total flowback volume recovered (bbls): | 795 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 142360 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7628 ft. | # Of Holes: | 76 | | Interval Bottom: | 7647 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/10/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 6 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.003 |
| Average MCFE per Day | 0.016 |
| Federal Financial Assurance | i | |
|
|