|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/9/2023 Measured TD: 6855 ft. Vertical TD: 6665 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/9/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 1/26/2013 | | Proposed Top PZ Location: | Sec:31 Twp: 5N 62W | Footage: 667 FNL 1982 FEL | | Bottom Hole Location: | Sec:31 Twp: 5N 62W | Footage: 667 FNL 1982 FEL | | Proposed Depth/Form: | 6850 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 40, Drill Unit: NWNE | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 400 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 260, Top: 0 ft., Bottom: 400 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6850 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 247, Top: 5800 ft., Bottom: 6850 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/29/2011 | | Spud Date: | 6/24/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 6855 ft. | Measured PB depth: | 6823 ft. | | True Vertical TD: | 6665 ft. | True Vertical PB depth: | 6633 ft. | | Top PZ Location: | Sec:31 Twp: 5N 62W | Footage: 667 FNL 1982 FEL | | Bottom Hole Location: | Sec:31 Twp: 5N 62W | Footage: 667 FNL 1982 FEL | | Log Types: | CBL, GR, CD,CN, Dl | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 8.625 in., Top: 0 ft., Depth: 432 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 440, Top: 0 ft., Bottom: 432 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6840 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 2376 ft., Bottom: 6840 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3436 ft. | | | | | SUSSEX | 4112 ft. | | | | | NIOBRARA | 6422 ft. | | | | | FORT HAYS | 6662 ft. | | | | | CODELL | 6687 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 12/6/2019 Interval Top: 6699 ft. Interval Bottom: 6709 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6699 ft. | # Of Holes: | 40 | | Interval Bottom: | 6709 ft. | Hole Size: | 0.4 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/9/2023 Interval Top: 6444 ft. Interval Bottom: 6709 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/7/2011 | | Treatment Summary: | CODELL PUMPED 32,634 GAL PAD FLUID. PUMPED 104,580 GAL PHASERFRAC W/250,900 LBS 20/40 SAND. ISDP 3391 PSI, ATP 3586 PSI, ATR 22.1 BPM. NIOBRARA PUMPED 20,034 PAD FLUID. PUMPED 124,782 GAL PHASER FRAC W/238,700 LBS. 30/50 SAND. ISDP 3566 PSI, ATP 4072 PSI, ATR 51.2 BPM. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 43 | | CALC_BBLS_OIL | 43 | | CALC_MCF_GAS | 27 | | CASING_PRESS | 191 | | GRAVITY_OIL | 40 | | MCF_GAS | 27 |
| | Perforation Data: | | Interval Top: | 6444 ft. | # Of Holes: | 88 | | Interval Bottom: | 6709 ft. | Hole Size: | 0.4 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/6/2019 Interval Top: 6444 ft. Interval Bottom: 6596 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6444 ft. | # Of Holes: | 48 | | Interval Bottom: | 6596 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/09/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|