|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 12/1/2024 Measured TD: 8841 ft. Vertical TD: 8640 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 12/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 1/20/2013 | Proposed Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 1358 FSL 2559 FEL | Bottom Hole Location: | Sec:29 Twp: 1N 68W | Footage: 1358 FSL 2559 FEL | Proposed Depth/Form: | 8709 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 430, Top: 0 ft., Bottom: 900 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8709 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 550, Top: 200 ft., Bottom: 8709 ft. |
| | |
Wellbore Completed | Completion Date: | 2/4/2011 | Spud Date: | 1/28/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8841 ft. | Measured PB depth: | 8748 ft. | True Vertical TD: | 8640 ft. | True Vertical PB depth: | 8547 ft. | Top PZ Location: | Sec:29 Twp: 1N 68W | Footage: 1358 FSL 2559 FEL | Bottom Hole Location: | Sec:29 Twp: 1N 68W | Footage: 1358 S 2559 E | Log Types: | Compensated Density Compensated Neutron Dual Induction
Cement Bond Log Gamma Ray | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 900 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 670, Top: 0 ft., Bottom: 900 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8709 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 660, Top: 5710 ft., Bottom: 8709 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4536 ft. | | | | SUSSEX | 4924 ft. | | | | NIOBRARA | 7766 ft. | | | | CODELL | 8106 ft. | | | | FORT HAYS | 8204 ft. | | | | J SAND | 8656 ft. | | | |
Formation JSND Formation Classification: Status: PR - 12/1/2024 Interval Top: 8666 ft. Interval Bottom: 8674 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/16/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/28/2011 | Treatment Summary: | PERFS 8666 - 8674 HOLES 49 SIZE .42 SLICKWATER FRAC THE J-SAND, FORMATION BROKE AT 2175 PSI, AND TREATED AT AN AVERAGE RATE OF 62.7 BPM, AVERAGE TREATMENT PRESSURE 4185 PSI, TOTAL FLUID PUMPED WAS 5432 BBL, THE TOTAL PROPPANT WAS 89.663 LBS OF 30-50 OTTAWA SAND. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/17/2011 | Test Method: | Flowing | Hours Tested: | | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1281 | CALC_BBLS_H2O | 172 | CALC_MCF_GAS | 167 | CASING_PRESS | 1830 | GRAVITY_OIL | 48 |
| Perforation Data: | Interval Top: | 8666 ft. | # Of Holes: | 49 | Interval Bottom: | 8674 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: Status: PR - 12/1/2024 Interval Top: 8106 ft. Interval Bottom: 8120 ft. Completed Information for Formation CODELL | 1st Production Date: | 7/2/2011 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/25/2011 | Treatment Summary: | PERFS 8106-8120 HOLES 56 SIZE .38 FRAC CODELL W/203,451 GAL FRESH WATER AND 132,810 LBS 30/50 OTTAWA SAND. FORMATION BROKE @ 2879 PSI. INJ RATE = 4.5 BBL/MIN |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8214 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/2/2011 | Test Method: | Flowing | Hours Tested: | | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1281 | CALC_BBLS_H2O | 79 | CALC_BBLS_OIL | 21 | CALC_GOR | 1571 | CALC_MCF_GAS | 33 | CASING_PRESS | 2300 | GRAVITY_OIL | 48 | TUBING_PRESS | 650 |
| Perforation Data: | Interval Top: | 8106 ft. | # Of Holes: | 56 | Interval Bottom: | 8120 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 21 |
Total Gas Produced (MCF) | 4 |
GOR | 190 |
GOR Determination | BOE |
Average BOE per Day | 0.058 |
Average MCFE per Day | 0.350 |
Federal Financial Assurance | i | |
|
|