|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/24/2019 Measured TD: 8590 ft. Vertical TD: 8430 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/24/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 1/19/2013 | Proposed Top PZ Location: | Sec:14 Twp: 1N 68W | Footage: 2002 FSL 1998 FWL | Bottom Hole Location: | Sec:14 Twp: 1N 68W | Footage: 2002 FSL 2002 FWL | Proposed Depth/Form: | 8653 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2SW/4 | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: 250-11 , Unit Acreage: 80, Drill Unit: N/2SW/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1160 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 812, Top: 0 ft., Bottom: 1160 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8653 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8653 ft. |
| | |
Wellbore Completed | Completion Date: | 6/24/2011 | Spud Date: | 6/21/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8590 ft. | Measured PB depth: | 8559 ft. | True Vertical TD: | 8430 ft. | True Vertical PB depth: | 8399 ft. | Top PZ Location: | Sec:14 Twp: 1N 68W | Footage: 2002 FSL 1998 FWL | Bottom Hole Location: | Sec:14 Twp: 1N 68W | Footage: 2002 S 2002 W | Log Types: | PRE FORM 5 | Log Types: | P/E AILC-CNLD-ML-TC-CV; CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1210 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 800, Top: 0 ft., Bottom: 1210 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8577 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 5583 ft., Bottom: 8577 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5583 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 750, Top: 520 ft., Bottom: 5583 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4403 ft. | 4600 ft. | | | SUSSEX | 4880 ft. | 5060 ft. | | | SUSSEX-SHANNON | 5411 ft. | 5485 ft. | | | NIOBRARA | 7637 ft. | 7945 ft. | | | FORT HAYS | 7945 ft. | 8018 ft. | | | CODELL | 8018 ft. | 8439 ft. | | | J SAND | 8457 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 9/26/2019 Interval Top: 8468 ft. Interval Bottom: 8490 ft. Completed Information for Formation J SAND | 1st Production Date: | 8/29/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/2/2011 | Treatment Summary: | J S PERF 8468-8490 HOLES 66 SIZE 0.40
Frac J-Sand down 4-1/2" Csg w/ 146,567 gal Slickwater w/ 115,160# 40/70, 4,000# SB Excel |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8468 ft. | # Of Holes: | 66 | Interval Bottom: | 8490 ft. | Hole Size: | 0.4 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 8/30/2011 Interval Top: 7636 ft. Interval Bottom: 8490 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 8/29/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/2/2011 | Treatment Summary: | NB PERF 7636-7882 HOLES 62 SIZE 0.42
CD PERF 8020-8038 HOLES 54 SIZE 0.42
J S PERF 8468-8490 HOLES 66 SIZE 0.40 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/30/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 1 | BTU_GAS | 1246 | CALC_BBLS_OIL | 1 | CALC_GOR | 1000 | CALC_MCF_GAS | 1 | CASING_PRESS | 887 | GRAVITY_OIL | 48 | MCF_GAS | 1 |
| Perforation Data: | Interval Top: | 7636 ft. | # Of Holes: | 182 | Interval Bottom: | 8490 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/26/2019 Interval Top: 7636 ft. Interval Bottom: 8038 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/29/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/16/2011 | Treatment Summary: | NB PERF 7636-7882 HOLES 62 SIZE 0.42 CD PERF 8020-8038 HOLES 54 SIZE 0.42
Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 244,566 gal Slickwater w/ 200,380# 40/70, 4,000# SuperLC
Frac Codell down 4-1/2" Csg w/ 198,912 gal Slickwater w/ 150,060# 40/70, 4,000# SuperLC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7636 ft. | # Of Holes: | 116 | Interval Bottom: | 8038 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 09/26/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|