Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32770
Well Classification: OW Status: PA - 6/23/2020
Well Name/No:BINDER #CSW-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/23/2020
FacilityID:420964LocationID:420955
County:WELD #123Location:NESW 20 4N67W 6
Field:WATTENBERG - #90750Elevation:4909 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2464FSL  2247 FWLLat/Long: 40.298100 / -104.914970Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.298090 / -104.915080Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/23/2020             Measured TD: 7653 ft.    Vertical TD: 7456 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/23/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/22/2012
Proposed Top PZ Location:Sec:20 Twp: 4N 67W Footage: 1290 FSL  1360 FWL
Bottom Hole Location:Sec:20 Twp: 4N 67W Footage: 1290 FSL  1360 FWL
Proposed Depth/Form:7900 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SW/4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 490 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 250, Top: 0 ft., Bottom: 490 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7900 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 150, Top: 7140 ft., Bottom: 7900 ft.

Wellbore Completed
Completion Date:2/1/2012
Spud Date:1/27/2012Spud Date Is:ACTUAL
Measured TD:7653 ft.Measured PB depth:7601 ft.
True Vertical TD:7456 ft.True Vertical PB depth:7406 ft.
Top PZ Location:Sec:20 Twp: 4N 67WFootage: 1290 FSL  1360 FWL
Bottom Hole Location:Sec:20 Twp: 4N 67WFootage: 1290 FSL  1360 FWL
Log Types:LAS Induction Gamma Ray
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 521 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 521 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7615 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 555, Top: 2590 ft., Bottom: 7615 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2422 ft.
PARKMAN3732 ft.
SUSSEX4316 ft.
SHANNON4774 ft.
NIOBRARA7150 ft.
FORT HAYS7433 ft.
CODELL7455 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/21/2013                 Interval Top: 7455 ft.    Interval Bottom: 7475 ft.

 Completed Information for Formation CODELL
1st Production Date:4/18/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/19/2012
Treatment Summary:Codell Frac Treatment Codell Treatment Totals: Cln Fluid: 4089.3 bbls, Sand Laden Fluid: 2522.5 bbls, Proppant: 115,580 lbs 30/50, ATP: 4920 psi, ATR: 61.3 bpm, MTP: 5408 psi, MTR: 61.6 bpm. 17:41 shut in well bleed off pressure.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7455 ft.# Of Holes:38
Interval Bottom:7475 ft.Hole Size:0.35 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 6/23/2020                 Interval Top: 7237 ft.    Interval Bottom: 7475 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/18/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 58
BBLS_OIL 114
BTU_GAS 1337
CALC_BBLS_H2O 6
CALC_BBLS_OIL 114
CALC_GOR 1807
CALC_MCF_GAS 206
CASING_PRESS 1600
GRAVITY_OIL 50
MCF_GAS 206
TUBING_PRESS 1500
Perforation Data:
Interval Top:7237 ft.# Of Holes:63
Interval Bottom:7475 ft.Hole Size:0.35 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 8/21/2013                 Interval Top: 7237 ft.    Interval Bottom: 7327 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/18/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/9/2012
Treatment Summary:Niobrara Frac Treatment Niobrara Treatment Totals: Cln Fluid: 5665.2 bbls, Sand Laden Fluid: 4175.5 bbls, Proppant: 200,260 lbs 40/50, 4000 20/40 SLC ATP: 4512 psi, ATR: 56.8 bpm, MTP: 5251 psi, MTR: 58.7 bpm.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7237 ft.# Of Holes:25
Interval Bottom:7327 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/23/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No