|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/23/2020 Measured TD: 8045 ft. Vertical TD: 7435 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/23/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 12/22/2012 | Proposed Top PZ Location: | Sec:20 Twp: 4N 67W | Footage: 1356 FSL 68 FWL | Bottom Hole Location: | Sec:20 Twp: 4N 67W | Footage: 1356 FSL 68 FWL | Proposed Depth/Form: | 7720 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2 SW/4 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2 SW/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 490 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 250, Top: 0 ft., Bottom: 490 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7720 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 150, Top: 6930 ft., Bottom: 7720 ft. |
| | |
Wellbore Completed | Completion Date: | 1/14/2012 | Spud Date: | 1/9/2012 | Spud Date Is: | ACTUAL | Measured TD: | 8045 ft. | Measured PB depth: | 7984 ft. | True Vertical TD: | 7435 ft. | True Vertical PB depth: | 7374 ft. | Top PZ Location: | Sec:20 Twp: 4N 67W | Footage: 1356 FSL 68 FWL | Bottom Hole Location: | Sec:20 Twp: 4N 67W | Footage: 1356 FSL 68 FWL | Log Types: | Triple Combo
High Resolution Induction
Compenstated Density/Neutron Gamma Ray | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 509 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 370, Top: 0 ft., Bottom: 507 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8033 ft., Weight: 11.5 , Citings Type: ACTUAL | Cement: | Sacks: 605, Top: 2090 ft., Bottom: 8033 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | GREELEY SAND | 2494 ft. | | | | PARKMAN | 3958 ft. | | | | SUSSEX | 4628 ft. | | | | SHANNON | 5162 ft. | | | | NIOBRARA | 7554 ft. | | | | FORT HAYS | 7843 ft. | | | | CODELL | 7865 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 8/21/2013 Interval Top: 7864 ft. Interval Bottom: 7884 ft. Completed Information for Formation CODELL | 1st Production Date: | 4/18/2012 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/19/2012 | Treatment Summary: | Codell Frac Treatment
Codell Treatment Totals: Cln Fluid: 3986.3 bbls, Sand Laden Fluid: 2496.5 bbls, Proppant: 1111,780 lbs 30/50, ATP: 4660 psi, ATR: 59.1 bpm, MTP: 5858 psi, MTR: 59.2 bpm. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7864 ft. | # Of Holes: | 37 | Interval Bottom: | 7884 ft. | Hole Size: | 0.35 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 6/23/2020 Interval Top: 7563 ft. Interval Bottom: 7884 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/18/2012 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 58 | BBLS_OIL | 169 | BTU_GAS | 1361 | CALC_BBLS_H2O | 6 | CALC_BBLS_OIL | 169 | CALC_GOR | 1219 | CALC_MCF_GAS | 206 | CASING_PRESS | 2100 | GRAVITY_OIL | 52 | MCF_GAS | 206 | TUBING_PRESS | 240 |
| Perforation Data: | Interval Top: | 7563 ft. | # Of Holes: | 53 | Interval Bottom: | 7884 ft. | Hole Size: | 0.35 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 8/21/2013 Interval Top: 7563 ft. Interval Bottom: 7735 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 4/18/2012 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/3/2012 | Treatment Summary: | Niobrara Frac Treatment
Niobrara Treatment Totals: Cln Fluid: 5960.3 bbls, Sand Laden Fluid: 4324.8 bbls, Proppant: 200,380 lbs 40/50, 4000 20/40 SLC ATP: 4644 psi, ATR: 61.2 bpm, MTP: 6419 psi, MTR: 61.4 bpm. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7563 ft. | # Of Holes: | 16 | Interval Bottom: | 7735 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
Reported Plugged | Y | 06/23/2020 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|