Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32764
Well Classification: GW Status: PA - 6/23/2020
Well Name/No:BINDER #14-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/23/2020
FacilityID:420952LocationID:420955
County:WELD #123Location:NESW 20 4N67W 6
Field:WATTENBERG - #90750Elevation:4909 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2464FSL  2217 FWLLat/Long: 40.298100 / -104.915080Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.298090 / -104.914970Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 6/23/2020             Measured TD: 7981 ft.    Vertical TD: 7440 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 6/23/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/22/2012
Proposed Top PZ Location:Sec:20 Twp: 4N 67W Footage: 656 FSL  601 FWL
Bottom Hole Location:Sec:20 Twp: 4N 67W Footage: 657 FSL  600 FWL
Proposed Depth/Form:7680 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW/4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 490 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 250, Top: 0 ft., Bottom: 490 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7680 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 150, Top: 6890 ft., Bottom: 7680 ft.

Wellbore Completed
Completion Date:1/23/2012
Spud Date:1/18/2012Spud Date Is:ACTUAL
Measured TD:7981 ft.Measured PB depth:7941 ft.
True Vertical TD:7440 ft.True Vertical PB depth:7379 ft.
Top PZ Location:Sec:20 Twp: 4N 67WFootage: 656 FSL  601 FWL
Bottom Hole Location:Sec:20 Twp: 4N 67WFootage: 657 FSL  600 FWL
Log Types:COMPENSATED DENSITY COMPENSATED NEUTRON GAMMA RAY HIGH RESOLUTION INDUCTION LOG
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 521 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 521 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7956 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 585, Top: 2590 ft., Bottom: 7956 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2497 ft.
PARKMAN3918 ft.
SUSSEX4520 ft.
SHANNON5072 ft.
NIOBRARA7491 ft.
FORT HAYS7767 ft.
CODELL7790 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 9/9/2013                  Interval Top: 7790 ft.    Interval Bottom: 7807 ft.

 Completed Information for Formation CODELL
1st Production Date:4/18/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7790 ft.# Of Holes:40
Interval Bottom:7807 ft.Hole Size:0.35 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 6/23/2020                 Interval Top: 7491 ft.    Interval Bottom: 7807 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/18/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 116
BBLS_OIL 145
BTU_GAS 1129
CALC_BBLS_H2O 12
CALC_BBLS_OIL 145
CALC_GOR 2848
CALC_MCF_GAS 413
CASING_PRESS 1900
GRAVITY_OIL 50
MCF_GAS 413
TUBING_PRESS 1400
Perforation Data:
Interval Top:7491 ft.# Of Holes:53
Interval Bottom:7807 ft.Hole Size:0.35 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 9/9/2013                  Interval Top: 7491 ft.    Interval Bottom: 7660 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/18/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7491 ft.# Of Holes:13
Interval Bottom:7660 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/23/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No