|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 2/25/2025 Measured TD: 7394 ft. Vertical TD: 7368 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 2/25/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/15/2012 | | Proposed Top PZ Location: | Sec:15 Twp: 2N 65W | Footage: 510 FSL 510 FWL | | Bottom Hole Location: | Sec:15 Twp: 2N 65W | Footage: 510 FSL 510 FWL | | Proposed Depth/Form: | 7354 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2SW4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: S/2SW/ | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: , Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7354 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7354 ft. | | Casing: | String Type: 1ST LINER, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 8/10/2011 | | Spud Date: | 8/6/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7394 ft. | Measured PB depth: | 7364 ft. | | True Vertical TD: | 7368 ft. | True Vertical PB depth: | 7338 ft. | | Top PZ Location: | Sec:15 Twp: 2N 65W | Footage: 507 FSL 528 FWL | | Bottom Hole Location: | Sec:15 Twp: 2N W65W | Footage: 505 FSL 529 FWL | | Log Types: | PRE FORM 5 | | Log Types: | CD-CN-ML, HRI; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 927 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 927 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.25 in., Top: 0 ft., Depth: 7382 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1000, Top: 88 ft., Bottom: 7382 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3994 ft. | 4160 ft. | | | | SUSSEX | 4444 ft. | 4600 ft. | | | | NIOBRARA | 6927 ft. | | | | | FORT HAYS | 7184 ft. | | | | | CODELL | 7206 ft. | | | |
Formation NB-CD Formation Classification: OW Status: AB - 2/25/2025 Interval Top: 6969 ft. Interval Bottom: 7224 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/7/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/13/2011 | | Treatment Summary: | NB PERF 6969-7114 HOLES 60 SIZE 0.42 CD PERF 7208-7224 HOLES 64 SIZE 0.38
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 250,236 gal Slickwater w/ 201,700# 40/70, 5,020# SB Excel
Frac Codell down 4-1/2" Csg w/ 207,438 gal Slickwater w/ 152,900# 40/70, 4,500# SB Excel |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7165 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/8/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 10 | | BTU_GAS | 1223 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 10000 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 1550 | | GRAVITY_OIL | 48 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 6969 ft. | # Of Holes: | 124 | | Interval Bottom: | 7224 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/25/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|