|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/24/2020 Measured TD: 8600 ft. Vertical TD: 8495 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/24/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 12/15/2012 | Proposed Top PZ Location: | Sec:22 Twp: 1N 68W | Footage: 1882 FNL 2106 FEL | Bottom Hole Location: | Sec:22 Twp: 1N 68W | Footage: 1882 FNL 2106 FEL | Proposed Depth/Form: | 8588 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 980 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 390, Top: 0 ft., Bottom: 980 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8588 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 290, Top: 7484 ft., Bottom: 8588 ft. |
| | |
Wellbore Completed | Completion Date: | 11/17/2011 | Spud Date: | 11/9/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8600 ft. | Measured PB depth: | 8508 ft. | True Vertical TD: | 8495 ft. | True Vertical PB depth: | 8404 ft. | Top PZ Location: | Sec:22 Twp: 1N 68W | Footage: 1882 FNL 2106 FEL | Bottom Hole Location: | Sec:22 Twp: 1N 68W | Footage: 1882 FNL 2106 FEL | Log Types: | CBL/DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1003 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 972, Top: 0 ft., Bottom: 1003 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8576 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 748, Top: 3570 ft., Bottom: 8576 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4842 ft. | | | | NIOBRARA | 7697 ft. | | | | CODELL | 8076 ft. | | | | J SAND | 8464 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 9/24/2020 Interval Top: 8476 ft. Interval Bottom: 8496 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/20/2011 | Treatment Summary: | Frac'd the J-Sand 8476’– 8496’, (40 holes) w/ 62,538 gal 18 # pHaserFrac Hybrid
cross linked gel containing 250,140# 20/40 Sand. 12-20-11 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8476 ft. | # Of Holes: | 40 | Interval Bottom: | 8496 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 5/29/2012 Interval Top: 8076 ft. Interval Bottom: 8096 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/20/2011 | Treatment Summary: | Set CFP @ 8140'. 12-20-11
Frac'd the Codell 8076’ – 8097’, (42 holes) w/ 204,540 gals slick water containing
153,940 # 30/50 sand. 12-20-11 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8076 ft. | # Of Holes: | 42 | Interval Bottom: | 8096 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/31/2012 Interval Top: 7702 ft. Interval Bottom: 8496 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/31/2012 | Treatment Summary: | Set CBP @ 7620'. 03-29-12
Drilled out CBP @ 7620', CFP's @ 8140', 7930' to commingle the JSND-NBRR-CDL. 03-29-12 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8430 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/31/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 45 | BBLS_OIL | 77 | BTU_GAS | 1230 | CALC_BBLS_H2O | 45 | CALC_BBLS_OIL | 77 | CALC_GOR | 3701 | CALC_MCF_GAS | 285 | CASING_PRESS | 1526 | GRAVITY_OIL | 53 | MCF_GAS | 285 | TUBING_PRESS | 582 |
| Perforation Data: | Interval Top: | 7702 ft. | # Of Holes: | 194 | Interval Bottom: | 8496 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/24/2020 Interval Top: 7702 ft. Interval Bottom: 8096 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7702 ft. | # Of Holes: | 154 | Interval Bottom: | 8096 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/29/2012 Interval Top: 7702 ft. Interval Bottom: 7884 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 12/19/2011 | Treatment Summary: | Set CFP @ 7930'. 12-20-11
Frac'd the Niobrara 7702’ – 7884’ (112 holes), w/ 220,122 gals slick water containing
161,000# 30/50 sand. 12-20-11 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7702 ft. | # Of Holes: | 112 | Interval Bottom: | 7884 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 09/24/2020 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|