|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 12/18/2024 Measured TD: 7870 ft. Vertical TD: 7739 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 12/18/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/11/2012 | | Proposed Top PZ Location: | Sec:11 Twp: 2N 65W | Footage: 50 FSL 1320 FWL | | Bottom Hole Location: | Sec:11 Twp: 2 65W | Footage: 50 FSL 1320 FWL | | Proposed Depth/Form: | 7885 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 560, Top: , Bottom: 800 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7885 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7885 ft. | | Casing: | String Type: 1ST LINER, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 3/20/2011 | | Spud Date: | 3/16/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7870 ft. | Measured PB depth: | 7817 ft. | | True Vertical TD: | 7739 ft. | True Vertical PB depth: | 7686 ft. | | Top PZ Location: | Sec:11 Twp: 2N 65W | Footage: 39 FSL 1357 FWL | | Bottom Hole Location: | Sec:11 Twp: 2N 65W | Footage: 40 FSL 1329 FWL | | Log Types: | CBL, CL, CD-CN-ML, HRI | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 839 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 0 ft., Bottom: 839 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7849 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 6070 ft., Bottom: 7849 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5044 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 566 ft., Bottom: 5044 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4357 ft. | | | | | NIOBRARA | 7037 ft. | | | | | FORT HAYS | 7254 ft. | | | | | CODELL | 7276 ft. | | | | | J SAND | 7706 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 12/18/2024 Interval Top: 7710 ft. Interval Bottom: 7750 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/2/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/18/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 145,446 gal Slickwater w/ 115,440# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7710 ft. | # Of Holes: | 52 | | Interval Bottom: | 7750 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 5/7/2011 Interval Top: 7060 ft. Interval Bottom: 7750 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/2/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/7/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 15 | | BTU_GAS | 1298 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 10333 | | CALC_MCF_GAS | 155 | | CASING_PRESS | 1032 | | GRAVITY_OIL | 49 | | MCF_GAS | 155 |
| | Perforation Data: | | Interval Top: | 7060 ft. | # Of Holes: | 166 | | Interval Bottom: | 7750 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 12/18/2024 Interval Top: 7060 ft. Interval Bottom: 7294 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/2/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/21/2011 | | Treatment Summary: | NB PERF 7060-7138 HOLES 60 SIZE .42 CD PERF 7276-7294 HOLES 54 SIZE .42
Frac Niobrara B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 262,629 gal Slickwater w/ 200,360# 40/70, 4,000# SB Excel.
Frac Codell down 4-1/2" Csg w/ 210,677 gal Slickwater w/ 150,140# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7060 ft. | # Of Holes: | 114 | | Interval Bottom: | 7294 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/18/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|