Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32705
Well Classification: GW Status: PA - 1/6/2023
Well Name/No:COSSLETT #41-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/6/2023
FacilityID:420759LocationID:323151
County:WELD #123Location:SENE 22 1N68W 6
Field:WATTENBERG - #90750Elevation:5185 ft.
Planned Location:1496FNL  1263 FELLat/Long: 40.039830 / -104.984560Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.039829 / -104.984588Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/20/2011
End Date: 12/20/2011
Reported: 2/15/2012
Prior to rule 205A.b.(2)(A)
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 1/6/2023             Measured TD: 8610 ft.    Vertical TD: 8503 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 1/6/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/9/2012
Prop Depth/Form:8584 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 980 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 390, Top: 0 ft., Bottom: 980 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8584 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 7437 ft., Bottom: 8584 ft.

Wellbore Completed
Completion Date:11/24/2011
Spud Date:11/19/2011Spud Date Is:ACTUAL
Measured TD:8610 ft.Measured PB depth:8520 ft.
True Vertical TD:8503 ft.True Vertical PB depth:8412 ft.
Top PZ Location:Sec:22 Twp: 1N 68WFootage: 647 FNL  762 FELDepth
Bottom Hole Location:Sec:22 Twp: 1N 68WFootage: 647 FNL  762 FELDepth
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1004 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 1575, Top: 0 ft., Bottom: 1004 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8587 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 748, Top: 4270 ft., Bottom: 8587 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4865 ft.
NIOBRARA7644 ft.
CODELL8050 ft.
J SAND8454 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 1/6/2023                  Interval Top: 8496 ft.    Interval Bottom: 8516 ft.

 Completed Information for Formation J SAND
1st Production Date:1/27/2012Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/20/2011
Treatment Summary:Frac'd the J-Sand 8496’– 8516’, (40 holes) w/ 63,252 gal 18 # pHaserFrac Hybrid cross linked gel containing 250,100# 20/40 Sand. 12-20-11
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8496 ft.# Of Holes:40
Interval Bottom:8516 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/29/2012                 Interval Top: 8050 ft.    Interval Bottom: 8070 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/20/2011
Treatment Summary:Set CFP @ 8120'. 12-20-11 Frac'd the Codell 8050’ – 8070’, (40 holes) w/ 89,628 gal 22 # pHaserFrac Hybrid cross linked gel containing 250,300 # 30/50 sand. 12-20-11
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8050 ft.# Of Holes:40
Interval Bottom:8070 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 4/3/2012                  Interval Top: 7647 ft.    Interval Bottom: 8516 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:4/3/2012
Treatment Summary:Set CBP @ 7568'. 03-30-12 Drilled out CBP @ 7568', CFP @ 8120', 7850' to commingle the JSND-NBRR-CDL. 03-31-12
Tubing Size:2.375 in.Tubing Setting Depth:8458 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/3/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 5
BTU_GAS 1230
CALC_BBLS_H2O 18
CALC_BBLS_OIL 5
CALC_GOR 1400
CALC_MCF_GAS 7
CASING_PRESS 1567
GRAVITY_OIL 53
MCF_GAS 7
TUBING_PRESS 1038
Perforation Data:
Interval Top:7647 ft.# Of Holes:184
Interval Bottom:8516 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 1/6/2023                  Interval Top: 7647 ft.    Interval Bottom: 8070 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/27/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7647 ft.# Of Holes:144
Interval Bottom:8070 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/29/2012                 Interval Top: 7647 ft.    Interval Bottom: 7820 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/20/2011
Treatment Summary:Set CFP @ 7850'. 12-20-11 Frac'd the Niobrara 7647’ – 7820’ (104 holes), w/ 99,456 gals 18 # pHaserFrac Hybrid cross linked gel containing 250,000# 30/50 sand. 12-20-11
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7647 ft.# Of Holes:104
Interval Bottom:7820 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2023 - August 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No