|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/24/2020 Measured TD: 8641 ft. Vertical TD: 8548 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/24/2020 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 12/9/2012 | Prop Depth/Form: | 8589 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 980 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 390, Top: 0 ft., Bottom: 980 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8589 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 290, Top: 7487 ft., Bottom: 8589 ft. |
| | |
Wellbore Completed | Completion Date: | 11/1/2011 | Spud Date: | 10/26/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8641 ft. | Measured PB depth: | 8476 ft. | True Vertical TD: | 8548 ft. | True Vertical PB depth: | 8383 ft. | Top PZ Location: | Sec:22 Twp: 1N 68W | Footage: 2130 FNL 610 FEL | Depth | Bottom Hole Location: | Sec:22 Twp: 1N 68W | Footage: 2130 FNL 610 FEL | Depth | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1002 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1002 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8575 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 737, Top: 4010 ft., Bottom: 8575 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4817 ft. | | | | NIOBRARA | 7653 ft. | | | | J SAND | 8418 ft. | | | |
Formation JSND Formation Classification: Status: AB - 9/25/2020 Interval Top: 8431 ft. Interval Bottom: 8451 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/3/2012 | Treatment Summary: | Frac'd the J-Sand 8431’– 8451’, (40 holes) w/ 64,638 gal 18 # pHaserFrac Hybrid
cross linked gel containing 250,000# 20/40 Sand. 01-03-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8431 ft. | # Of Holes: | 40 | Interval Bottom: | 8451 ft. | Hole Size: | 0.42 in. |
|
Formation JNBRR Formation Classification: Status: CM - 3/29/2012 Interval Top: 7817 ft. Interval Bottom: 8451 ft. Completed Information for Formation J-NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/29/2012 | Treatment Summary: | Drilled out CFP's to commingle the JSND-NBRR. 03-23-12 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8400 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/29/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 73 | BBLS_OIL | 31 | BTU_GAS | 1230 | CALC_BBLS_H2O | 73 | CALC_BBLS_OIL | 31 | CALC_GOR | 6355 | CALC_MCF_GAS | 197 | CASING_PRESS | 1662 | GRAVITY_OIL | 51 | MCF_GAS | 197 | TUBING_PRESS | 104 |
| Perforation Data: | Interval Top: | 7817 ft. | # Of Holes: | 156 | Interval Bottom: | 8451 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: AB - 9/25/2020 Interval Top: 7656 ft. Interval Bottom: 7837 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/3/2012 | Treatment Summary: | Set CFP @ 7890'. 01-03-12
Frac'd the Niobrara 7656’ – 7837’ (116 holes), w/ 99,120 gals 18 # pHaserFrac Hybrid
cross linked gel containing 250,500 # 20/40 sand. 01-03-12 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7656 ft. | # Of Holes: | 116 | Interval Bottom: | 7837 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|