Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-32702
Well Classification: GW Status: PA - 1/6/2023
Well Name/No:COSSLETT #8-2-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/6/2023
FacilityID:420750LocationID:323151
County:WELD #123Location:SENE 22 1N68W 6
Field:WATTENBERG - #90750Elevation:5185 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1496FNL  1223 FELLat/Long: 40.039830 / -104.984420Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.039827 / -104.984438Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/27/2011
End Date: 12/27/2011
Reported: 2/15/2012
Prior to rule 205A.b.(2)(A)
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 1/6/2023             Measured TD: 8650 ft.    Vertical TD: 8510 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 1/6/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/9/2012
Proposed Top PZ Location:Sec:22 Twp: 1N 68W Footage: 1290 FNL  80 FEL
Bottom Hole Location:Sec:22 Twp: 1N 68W Footage: 1290 FNL  80 FEL
Proposed Depth/Form:8626 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 980 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 390, Top: 0 ft., Bottom: 980 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8626 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 7479 ft., Bottom: 8626 ft.

Wellbore Completed
Completion Date:10/25/2011
Spud Date:10/17/2011Spud Date Is:ACTUAL
Measured TD:8650 ft.Measured PB depth:8564 ft.
True Vertical TD:8510 ft.True Vertical PB depth:8510 ft.
Top PZ Location:Sec:22 Twp: 1N 68WFootage: 1290 FNL  80 FEL
Bottom Hole Location:Sec:22 Twp: 1N 68WFootage: 1290 FNL  80 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 978 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 524, Top: 0 ft., Bottom: 978 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8626 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 502, Top: 4190 ft., Bottom: 8626 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4914 ft.
NIOBRARA7682 ft.
CODELL8098 ft.
J SAND8538 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 1/6/2023                  Interval Top: 8552 ft.    Interval Bottom: 8572 ft.

 Completed Information for Formation J SAND
1st Production Date:1/30/2012Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/27/2011
Treatment Summary:Frac'd the J-Sand 8552’– 8572’, (40 holes) w/ 64,722 gal 18 # pHaserFrac Hybrid cross linked gel containing 250,520# 20/40 Sand. 12-27-11
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8552 ft.# Of Holes:40
Interval Bottom:8572 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/29/2012                 Interval Top: 8098 ft.    Interval Bottom: 8118 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/27/2011
Treatment Summary:Set CFP @ 8160'. 12-27-11 Frac'd the Codell 8098’ – 8118’, (40 holes) w/ 89,670 gal 22 # pHaserFrac Hybrid cross linked gel containing 252,270 # 30/50 sand. 12-27-11
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8098 ft.# Of Holes:40
Interval Bottom:8118 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/26/2012                 Interval Top: 7842 ft.    Interval Bottom: 8572 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/26/2012
Treatment Summary:Set CBP @ 7582. 03-22-12. Drilled out CBP @ 7582', CFP@ 8160', CFP @ 7910' to commingle the JSND-NBRR-CDL. 03-22-12
Tubing Size:2.375 in.Tubing Setting Depth:8523 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/26/2012Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 103
BBLS_OIL 135
BTU_GAS 1230
CALC_BBLS_H2O 103
CALC_BBLS_OIL 135
CALC_GOR 1970
CALC_MCF_GAS 266
CASING_PRESS 1150
GRAVITY_OIL 51
MCF_GAS 266
TUBING_PRESS 817
Perforation Data:
Interval Top:7842 ft.# Of Holes:196
Interval Bottom:8572 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 1/6/2023                  Interval Top: 7682 ft.    Interval Bottom: 8118 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/30/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7682 ft.# Of Holes:156
Interval Bottom:8118 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/29/2012                 Interval Top: 7682 ft.    Interval Bottom: 7862 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/27/2011
Treatment Summary:Set CFP @ 7910'. 12-27-11 Frac'd the Niobrara 7682’ – 7862’ (116 holes), w/ 99,078 gals 18 # pHaserFrac Hybrid cross linked gel containing 252,270# 30/50 sand. 12-27-11
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7682 ft.# Of Holes:116
Interval Bottom:7862 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/06/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No