|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/6/2023 Measured TD: 8650 ft. Vertical TD: 8510 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/6/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/9/2012 | | Proposed Top PZ Location: | Sec:22 Twp: 1N 68W | Footage: 1290 FNL 80 FEL | | Bottom Hole Location: | Sec:22 Twp: 1N 68W | Footage: 1290 FNL 80 FEL | | Proposed Depth/Form: | 8626 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 980 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 390, Top: 0 ft., Bottom: 980 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8626 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 7479 ft., Bottom: 8626 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/25/2011 | | Spud Date: | 10/17/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8650 ft. | Measured PB depth: | 8564 ft. | | True Vertical TD: | 8510 ft. | True Vertical PB depth: | 8510 ft. | | Top PZ Location: | Sec:22 Twp: 1N 68W | Footage: 1290 FNL 80 FEL | | Bottom Hole Location: | Sec:22 Twp: 1N 68W | Footage: 1290 FNL 80 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 978 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 524, Top: 0 ft., Bottom: 978 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8626 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 502, Top: 4190 ft., Bottom: 8626 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4914 ft. | | | | | NIOBRARA | 7682 ft. | | | | | CODELL | 8098 ft. | | | | | J SAND | 8538 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 1/6/2023 Interval Top: 8552 ft. Interval Bottom: 8572 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/30/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/27/2011 | | Treatment Summary: | Frac'd the J-Sand 8552’– 8572’, (40 holes) w/ 64,722 gal 18 # pHaserFrac Hybrid
cross linked gel containing 250,520# 20/40 Sand. 12-27-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8552 ft. | # Of Holes: | 40 | | Interval Bottom: | 8572 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 5/29/2012 Interval Top: 8098 ft. Interval Bottom: 8118 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/27/2011 | | Treatment Summary: | Set CFP @ 8160'. 12-27-11
Frac'd the Codell 8098’ – 8118’, (40 holes) w/ 89,670 gal 22 # pHaserFrac Hybrid cross
linked gel containing 252,270 # 30/50 sand. 12-27-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8098 ft. | # Of Holes: | 40 | | Interval Bottom: | 8118 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/26/2012 Interval Top: 7842 ft. Interval Bottom: 8572 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/26/2012 | | Treatment Summary: | Set CBP @ 7582. 03-22-12.
Drilled out CBP @ 7582', CFP@ 8160', CFP @ 7910' to commingle the JSND-NBRR-CDL. 03-22-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8523 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/26/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 103 | | BBLS_OIL | 135 | | BTU_GAS | 1230 | | CALC_BBLS_H2O | 103 | | CALC_BBLS_OIL | 135 | | CALC_GOR | 1970 | | CALC_MCF_GAS | 266 | | CASING_PRESS | 1150 | | GRAVITY_OIL | 51 | | MCF_GAS | 266 | | TUBING_PRESS | 817 |
| | Perforation Data: | | Interval Top: | 7842 ft. | # Of Holes: | 196 | | Interval Bottom: | 8572 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/6/2023 Interval Top: 7682 ft. Interval Bottom: 8118 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/30/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7682 ft. | # Of Holes: | 156 | | Interval Bottom: | 8118 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/29/2012 Interval Top: 7682 ft. Interval Bottom: 7862 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/27/2011 | | Treatment Summary: | Set CFP @ 7910'. 12-27-11
Frac'd the Niobrara 7682’ – 7862’ (116 holes), w/ 99,078 gals 18 # pHaserFrac Hybrid
cross linked gel containing 252,270# 30/50 sand. 12-27-11 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7682 ft. | # Of Holes: | 116 | | Interval Bottom: | 7862 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/06/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|