|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/3/2024 Measured TD: 8155 ft. Vertical TD: 8071 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/3/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/29/2012 | | Proposed Top PZ Location: | Sec:18 Twp: 1N 66W | Footage: 543 FSL 515 FEL | | Bottom Hole Location: | Sec:18 Twp: 1N 66W | Footage: 554 FSL 508 FEL | | Proposed Depth/Form: | 8149 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2SE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 960 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 672, Top: 0 ft., Bottom: 960 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8149 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8149 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/20/2011 | | Spud Date: | 1/15/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8155 ft. | Measured PB depth: | 8117 ft. | | True Vertical TD: | 8071 ft. | True Vertical PB depth: | 8033 ft. | | Top PZ Location: | Sec:18 Twp: 1N 66W | Footage: 543 FSL 515 FEL | | Bottom Hole Location: | Sec:18 Twp: 1N 66W | Footage: 554 FSL 508 FEL | | Log Types: | CBL, SD-DSN-AC-TR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 990 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 630, Top: 0 ft., Bottom: 990 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8145 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6948 ft., Bottom: 8145 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5802 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1125, Top: 880 ft., Bottom: 5816 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7178 ft. | | | | | FORT HAYS | 7524 ft. | | | | | CODELL | 7546 ft. | | | | | GREENHORN | 7639 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 10/3/2024 Interval Top: 8020 ft. Interval Bottom: 8028 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/20/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/21/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 152,166 gal Slickwater w/ 115,000# 40/70, 4,000# SB Excel, 0# . |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8020 ft. | # Of Holes: | 16 | | Interval Bottom: | 8028 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 5/2/2011 Interval Top: 7316 ft. Interval Bottom: 8028 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 4/20/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/21/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 152,166 gal Slickwater w/ 115,000# 40/70, 4,000# SB Excel, 0# .
NB PERF 7316-7408 HOLES 60 SIZE .38 CD PERF 7546-7564 HOLES 54 SIZE .42
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 240,912 gal Slickwater w/ 200,500# 40/70, 4,000# SB Excel.
Frac Codell down 4-1/2" Csg w/ 204,498 gal Slickwater w/ 150,680# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/2/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 68 | | BTU_GAS | 1217 | | CALC_BBLS_OIL | 68 | | CALC_GOR | 647 | | CALC_MCF_GAS | 44 | | CASING_PRESS | 120 | | GRAVITY_OIL | 48 | | MCF_GAS | 44 |
| | Perforation Data: | | Interval Top: | 7316 ft. | # Of Holes: | 130 | | Interval Bottom: | 8028 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/3/2024 Interval Top: 7316 ft. Interval Bottom: 7564 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/20/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/28/2011 | | Treatment Summary: | NB PERF 7316-7408 HOLES 60 SIZE .38 CD PERF 7546-7564 HOLES 54 SIZE .42
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 240,912 gal Slickwater w/ 200,500# 40/70, 4,000# SB Excel.
Frac Codell down 4-1/2" Csg w/ 204,498 gal Slickwater w/ 150,680# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7316 ft. | # Of Holes: | 114 | | Interval Bottom: | 7564 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/03/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|