|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 9/1/2024 Measured TD: 8616 ft. Vertical TD: 8100 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 9/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 11/29/2012 | Proposed Top PZ Location: | Sec:18 Twp: 1N 66W | Footage: 2600 FSL 2600 FEL | Bottom Hole Location: | Sec:18 Twp: 1N 66W | Footage: 2600 FSL 2600 FEL | Proposed Depth/Form: | 8535 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 960 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 672, Top: 0 ft., Bottom: 960 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8535 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 200, Top: , Bottom: 8535 ft. |
| | |
Wellbore Completed | Completion Date: | 1/26/2011 | Spud Date: | 1/21/2011 | Spud Date Is: | ACTUAL | Measured TD: | 8616 ft. | Measured PB depth: | 8547 ft. | True Vertical TD: | 8100 ft. | True Vertical PB depth: | 8031 ft. | Top PZ Location: | Sec:18 Twp: 1N 66W | Footage: 2562 FSL 2601 FEL | Bottom Hole Location: | Sec:18 Twp: 1N 66W | Footage: 2582 S 2632 E | Log Types: | PRELIMINARY FORM 5
PLAN TO COMPLETE WITHIN 3 MONTHS | Log Types: | CBL, SD-DSN-AC-TR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 992 ft., Weight: 24# , Citings Type: ACTUAL | Cement: | Sacks: 630, Top: 0 ft., Bottom: 991 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8578 ft., Weight: 11.6# , Citings Type: ACTUAL | Cement: | Sacks: 240, Top: 7030 ft., Bottom: 8578 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 910 ft., Depth: 5907 ft., Bottom: 5907 ft., Sacks: 793, Method: DV TOOL | Additional Cement: | String Type: 1ST , Top: 1380 ft., Depth: 5944 ft., Bottom: 5944 ft., Sacks: 793, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4950 ft. | | | | TEEPEE BUTTES | 6908 ft. | | | | NIOBRARA | 7702 ft. | | | | FORT HAYS | 8001 ft. | | | | CODELL | 8023 ft. | | | | J SAND | 8426 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 8/1/2024 Interval Top: 8434 ft. Interval Bottom: 8466 ft. Completed Information for Formation J SAND | 1st Production Date: | 4/27/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/21/2011 | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 145,698 gal Slickwater w/ 115,060# 40/70, 4,000# SB Excel, 0# . |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8434 ft. | # Of Holes: | 44 | Interval Bottom: | 8466 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 5/4/2011 Interval Top: 7816 ft. Interval Bottom: 8466 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 4/27/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/4/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 62 | BTU_GAS | 1217 | CALC_BBLS_OIL | 62 | CASING_PRESS | 1200 | GRAVITY_OIL | 48 |
| Perforation Data: | Interval Top: | 7816 ft. | # Of Holes: | 154 | Interval Bottom: | 8466 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 9/1/2024 Interval Top: 7816 ft. Interval Bottom: 8042 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 4/27/2011 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/4/2011 | Treatment Summary: | NB PERF 7816-7888 HOLES 60 SIZE .42 CD PERF 8024-8042 HOLES 54 SIZE .42
Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 247,338 gal Slickwater w/ 200,180# 40/70, 4,000# SB Excel.
Frac Codell down 4-1/2" Csg w/ 206,346 gal Slickwater w/ 150,240# 40/70, 4,000# SB Excel. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7816 ft. | # Of Holes: | 114 | Interval Bottom: | 8042 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 14 |
Total Gas Produced (MCF) | 253 |
GOR | 18071 |
GOR Determination | MCFE |
Average BOE per Day | 0.160 |
Average MCFE per Day | 0.907 |
Federal Financial Assurance | i | |
|
|