|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 1/15/2025 Measured TD: 8572 ft. Vertical TD: 8316 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 1/15/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/26/2012 | | Proposed Top PZ Location: | Sec:2 Twp: 1N 68W | Footage: 1980 FSL 1817 FEL | | Bottom Hole Location: | Sec:2 Twp: 1N 68W | Footage: 1980 FSL 1817 FEL | | Proposed Depth/Form: | 8606 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 900 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 630, Top: 0 ft., Bottom: 900 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8606 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 8606 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/18/2011 | | Spud Date: | 3/14/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 8572 ft. | Measured PB depth: | 8527 ft. | | True Vertical TD: | 8316 ft. | True Vertical PB depth: | 8271 ft. | | Top PZ Location: | Sec:2 Twp: 1N 68W | Footage: 2009 FSL 1839 FEL | | Bottom Hole Location: | Sec:2 Twp: 1N 68W | Footage: 2011 FSL 1838 FEL | | Log Types: | P/E AILC-CNLD-ML-TC-CL/CV; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 937 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 937 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8561 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 635, Top: 4014 ft., Bottom: 8561 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4014 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: 650 ft., Bottom: 4014 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | CODELL | 8009 ft. | | | | | J SAND | 8452 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 1/15/2025 Interval Top: 8452 ft. Interval Bottom: 8472 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/20/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 4/22/2019 | Treatment End Date: | N/A | | Treatment Summary: | RBP AT 7950' WAS RELEASED ON 8/9/2018
HZ SAFEY UNPREP | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 5/10/2011 | | Treatment Summary: | J S Perf 8452-8472 Holes 56 Size 0.42
Frac J-Sand down 4-1/2" Csg w/ 148,176 gal Slickwater w/ 115,540# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8452 ft. | # Of Holes: | 56 | | Interval Bottom: | 8472 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: AB - 1/15/2025 Interval Top: 8009 ft. Interval Bottom: 8027 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/20/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 4/22/2019 | Treatment End Date: | N/A | | Treatment Summary: | RBP AT 7950' WAS RELEASED ON 8/9/2018
HZ SAFEY UNPREP | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 5/10/2011 | | Treatment Summary: | CD Perf 8009-8027 Holes 54 Size 0.42
Frac Codell down 4-1/2" Csg w/ 205,674 gal Slickwater w/ 150,660# 40/70, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8009 ft. | # Of Holes: | 54 | | Interval Bottom: | 8027 ft. | Hole Size: | 0.42 in. |
|
Formation J-CDL Formation Classification: Status: CM - 5/20/2011 Interval Top: 8009 ft. Interval Bottom: 8472 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 5/20/2011 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/10/2011 | | Treatment Summary: | CD Perf 8009-8027 Holes 54 Size 0.42
J S Perf 8452-8472 Holes 56 Size 0.42 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/20/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 25 | | BTU_GAS | 1173 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 3000 | | CALC_MCF_GAS | 75 | | CASING_PRESS | 2200 | | GRAVITY_OIL | 44 | | MCF_GAS | 75 |
| | Perforation Data: | | Interval Top: | 8009 ft. | # Of Holes: | 110 | | Interval Bottom: | 8472 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/15/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|